Hankinnat: Fortum Power and Heat Oy

>20 arkistoidut hankinnat

Fortum Power and Heat Oy on perinteisesti ollut seuraavien tuotteiden ostaja teollisuuskoneet, voimakoneet ja kattilalaitteistot.

Viimeaikaiset hankinnat Fortum Power and Heat Oy

2023-08-03   Electric Boiler Delivery, Otaniemi - Fortum Power and Heat Oy (Fortum Power and Heat Oy)
Fortum Power and Heat Oy (the Purchaser) is planning to implement an electric boiler to existing Otaniemi heat only boiler plant in Espoo, Finland. Electric boiler will produce heat to Fortum’s district heating (DH) networks. Näytä hankinnat »
2023-06-19   Delivery of Electric Boiler, Otaniemi - Fortum Power and Heat Oy (Fortum Power and Heat Oy)
Fortum Power and Heat Oy (the Purchaser) is planning to implement an electric boiler to existing Otaniemi heat only boiler plant in Espoo, Finland. Electric boiler will produce heat to Fortum’s district heating (DH) networks. Näytä hankinnat »
2023-06-06   Pre-qualification for turnkey delivery of electric boiler to Nuijala heat station (Fortum Power and Heat Oy)
Fortum is planned to invest in Nuijala, Espoo with a new approx. 50-60 MW electric boiler, a 20,000 m3 district heat accumulator and DH pumping systems (the “Plant”). The Plant will store, produce, and deliver heat to Fortum district heating network in Espoo and Kirkkonummi. The Plant is designed to be operated remotely from the main control room at Suomenoja power plant (approx. 10 km from the Nuijala Plant). However, there will be a small local control room at the Plant for commissioning, start-up, … Näytä hankinnat »
2023-06-01   Pre-qualification for the turnkey delivery of accumulator to Nuijala heat station (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning a greenfield project in Nuijala Espoo and this pre-qualification is one of the main equipment which will be purchased to the site. Fortum Power and Heat Oy wishes to obtain a turnkey delivery of a new hot water district heat accumulator of 20 000 m3. The district heat accumulator will be unpressurized steel tank type and the maximum operation temperature is 98°C. Design temperature 100°C. The top of the tank is equipped with a steam blanket blocking the air to get … Näytä hankinnat »
2023-03-13   E-HOUSE for Mankkaa CHC-plant (Fortum Power and Heat Oy)
Fortum is building CHC (Combined Heating and Cooling)-plant in Espoo, Mankkaa. As a part of the project, E-House-delivery is needed. The delivery consist of prefabricated E-House container-module or modules including all the necessary electrical components regarding to power distribution for the plant. Preliminary technical description shall be published in Buyer's SAP Ariba-portal. Näytä hankinnat »
2023-01-30   RENEWAL OF ECONOMIZER TO KIVENLAHTI BIO-HEATING PLANT, ESPOO FINLAND (Fortum Power and Heat Oy)
Turnkey delivery of economizer to Kivenlahti bio-heating plant. Kivenlahti K4-boiler was commissioned in 2020. The fuel power of the boiler is 49 MW. The fuel is solid wood fuels which consist of recycled wood, forest biomass (forest residues, hard wood chips) and industrial by-products (bark, saw dust). The boiler produces heat to the district heating network of Espoo. The boiler is connected to the district heating network with a heat exchanger. The boiler is a water boiler equipped with a stream drum. … Näytä hankinnat »
2022-12-13   Heat Pump Module (Fortum Power and Heat Oy)
Fortum Power and Heat Oy (the Purchaser) is planning to implement water-to-water heat pump (WWHP) plant to Mankkaa, Espoo, Finland. WWHP plant will produce cooling to local fluid network and heating to Fortum’s district heating (DH) networks. We kindly ask interested bidders to submit application to participate tendering process of Heat Pump modules that have 3500 kW of cooling capacity in full scale. 3/4 of capacity will be installed at once and 1/4 of capacity later as an expansion into the … Näytä hankinnat »
Mainitut toimittajat: Oilon Oy
2022-11-17   Invitation to Tender for Electrification for Karaportti 3,5 MW AWHP plant, Espoo Finland (Fortum Power and Heat Oy)
The scope of works is the turn-key delivery for the electrification of the AWHP plant within the scope of supply and delivery limits specified in the Appendices. More detailed scope of the Works, Delivery Limits and other optional works are discussed in Appendix 3 and its sub-appendices. Site is located at the address Karaportti 02610 Espoo, Finland, The delivery shall include complete design, engineering, procurement, manufacturing, quality control, seaworthy packaging, transportation and forwarding to … Näytä hankinnat »
2022-10-17   Espoon, Kauniaisten ja Kirkkonummen alueen kaukolämpö- ja kaukokylmäverkoston rakentamisen vuosiurakoinnin... (Fortum Power and Heat Oy)
Raamisopimuksen kohteena on Espoon, Kauniaisten ja Kirkkonummen alueilla sopimuskaudella toteutettava kaukolämpö- ja kaukojäähdytysverkon uudisrakentaminen, verkoston saneerausrakentaminen ja ylläpitorakentaminen. Mahdolliset erillisinvestointeina toteutettavat runkolinjat tms. isommat erilliset työkohteet tulemme sopimuskaudellakin kilpailuttamaan erikseen. Näytä hankinnat »
Mainitut toimittajat: Maalinja Oy Maarakennusliike Pusku Oy
2022-10-12   Pre-qualification of outdoor installed heat pumps for air to water heat pump plant (Fortum Power and Heat Oy)
Fortum Power and Heat Oy (the Purchaser) is planning to implement heat pump plant to Espoo, Kera. HP plant will produce heating and cooling to Fortum’s district heating (DH) and cooling (DC) networks. Näytä hankinnat »
2022-10-12   Pre-qualification for indoor installed heat pumps for water to water heat pump plant (Fortum Power and Heat Oy)
Fortum Power and Heat Oy (the Purchaser) is planning to implement heat pump plant to Espoo, Kera. HP plant will produce heating and cooling to Fortum’s district heating (DH) and cooling (DC) networks. Näytä hankinnat »
2022-10-10   Electrification for Karaportti 3,5 MW AWHP plant, Espoo (Fortum Power and Heat Oy)
The scope of works is the turn-key delivery for the electrification of the AWHP plant within the scope of supply and delivery limits specified in the Appendices. More detailed scope of the Works, Delivery Limits and other optional works are discussed in appendices. Site is located at the address Karaportti 02610 Espoo, Finland, The delivery shall include complete design, engineering, procurement, manufacturing, quality control, seaworthy packaging, transportation and forwarding to the site, erection and … Näytä hankinnat »
2022-05-13   CHC Heat Pumps (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to build a new modular CHC (combined heat and cooling) heat pump plant in Espoo, Finland. Heat pumps will produce heating and cooling to Fortum’s heating and cooling networks. WWHP (water-to-water heat pump) plant will produce 3-5 MW cooling for DC networks. Supplier should propose suitable heat pumps which provide cooling to the DC network and supply heat to the DH network. Näytä hankinnat »
2022-03-30   Modular Heat Pump - Espoo, Finland (Fortum Power and Heat Oy)
Fortum Power and Heat Oy (the Purchaser) is planning to develop a modular heat pump concept for producing district heating. The first heat pump module(s) will be located at Espoo, Finland. Later, the module(s) may be transported and coupled to a bigger heat pump plant as one module of many. Supplier need to deliver a Modular Heat Pump setup which has at least 3500 kW of cooling capacity (in one or several heat pump modules). Heat pump module is a complete functioning unit which includes all the necessary … Näytä hankinnat »
2022-02-14   Datacenter Heat Pump Plants Espoo and Kirkkonummi: Electrical boilers (Fortum Power and Heat Oy)
Delivery of two electrical boiler plants for the heat pump plants in Finland: one located in Espoo and the other in Kirkkonummi. Näytä hankinnat »
2022-02-14   Datacenter Heat Pump Plants Espoo and Kirkkonummi: Main transformers, switchgears and cabling (110kV and 20kV) (Fortum Power and Heat Oy)
Delivery of main transformers, switchgears, and cabling (110kV and 20kV) to two heat recovery plants in Finland, one to Espoo and one to Kirkkonummi. The detailed scope of supply is presented in the tendering documents. Näytä hankinnat »
2022-01-31   Datacenter Heat Pump Plants Espoo and Kirkkonummi: Water-to-water heat pump modules (Fortum Power and Heat Oy)
Delivery of two Water to Water heat pump plants in Finland, one to Espoo and one to Kirkkonummi. Detailed scope of supply presented in the tendering documents. Näytä hankinnat »
2022-01-31   Datacenter Heat Pump Plants Espoo and Kirkkonummi: Air-to-water heat pump modules (Fortum Power and Heat Oy)
Delivery of two Air to Water heat pump plants in Finland, one to Espoo and one to Kirkkonummi. Detailed scope of supply presented in the tendering documents. Näytä hankinnat »
2022-01-18   Aalto Works 2 Heat Pumps - Prequalification (Fortum Power and Heat Oy)
Fortum Power and Heat Oy (the Purchaser) is planning to expand an existing air to water heat pump (AWHP) plant in Espoo. AWHP plant will produce heating and cooling to Fortum’s low temperature local area heating (LAH) and local area cooling (LAC) networks. The plant is located in Otaniemi (Espoo, Finland) on the plot which has already Fortum’s heat only boiler (HOB) plant. This request will work as invitation for the first phase of the procurement. We kindly ask interested bidders to submit application … Näytä hankinnat »
2022-01-04   Vermo 2, putki- ja laiteasennusurakka (Fortum Power and Heat Oy)
10 MW ilma-vesi-lämpöpumppulaitoksen putki- ja laiteasennusurakka Näytä hankinnat »
2021-11-12   Prequalification of turnkey delivery for electric boiler to Suomenoja power plant (Fortum Power and Heat Oy)
With this request, Fortum Power and Heat Oy wishes to obtain a turnkey delivery for an agreement for the supply of a appox. 50MW new electrode boiler with an associated expansion system, boiler circuit pump, control valves and heat exchanger for Suomenoja heat production facility. The scope will include complete design, engineering, manufacturing, installation, commissioning and training of the Purchaser’s operating and maintenance personnel. General plant and process design and engineering as well as … Näytä hankinnat »
2021-09-09   Vermo 2 Electrification (Fortum Power and Heat Oy)
Electrification for 10 MW air-to-water heat pump plant. Näytä hankinnat »
Mainitut toimittajat: VEO Oy
2021-08-25   Supply of Spare Parts for Suomenoja SO2 Gas Turbine - Pre-qualification (Fortum Power and Heat Oy)
Fortum Power and Heat Oy, a fully owned subsidiary of Fortum Corporation is planning a maintenance investment for SO2 gas turbine in Suomenoja Power Plant in Espoo, Finland. The scope of delivery for this tender is to purchase the spare parts required for the maintenance works as described in the appendices. Näytä hankinnat »
2021-06-02   Esivalinta kilpailutuksesta päästömittausten sopimuksesta vuosille 2022—2026 (Fortum Power and Heat Oy)
Fortum Power and Heat Oy:n kaukolämpö- ja kylmäliiketoiminta kilpailuttaa sopimusta Espoon ja Kirkkonummen alueella suoritettavia päästömittauksia vuosille 2022—2026. Näytä hankinnat »
2021-05-06   Vermo 2 Indoor Heat Pump Pre-qualification (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to implement an air-to-water heat pump (AWHP) plant to Vermo (Espoo, Finland). The AWHP plant will produce appr. 10 MW heating and appr. 8 MW cooling to Fortum’s district heating (DH) and cooling (DC) networks. The plant will be located in Vermo on the plot which has already Fortum’s heating plant. The AWHP plant will have two different kind of heat pumps: Pos 1: Outdoor installed heat pumps which take heat from the outside air and supply heat to an intermediate … Näytä hankinnat »
Mainitut toimittajat: Oilon Oy
2021-05-06   Vermo 2 Outdoor Heat Pump Pre-qualification (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to implement an air-to-water heat pump (AWHP) plant to Vermo (Espoo, Finland). The AWHP plant will produce appr. 10 MW heating and appr. 8 MW cooling to Fortum’s district heating (DH) and cooling (DC) networks. The plant will be located in Vermo on the plot which has already Fortum’s heating plant. The AWHP plant will have two different kind of heat pumps: Pos 1: Outdoor installed heat pumps which take heat from the outside air and supply heat to an intermediate … Näytä hankinnat »
2021-01-20   Mekaaniset asennukset ja hitsaus Espoo, esivalinta (Fortum Power and Heat Oy)
Puitesopimukset tehtäviin Mekaaniset asennukset ja hitsaus Fortumin Espoon ja Kirkkonummen voima- ja lämpölaitoksille. Näytä hankinnat »
2020-10-02   Pre-Qualification Top Level Automation System Supply for ESPOO District Heating System (Fortum Power and Heat Oy)
Fortum Heating and Cooling has launched an End-to-end (E2E) transformation program to enable the development of district heating system to meet the strategic objectives of reaching the climate goals of eliminating CO2 emissions. Regard to E2E, Fortum is looking for supplier for the top level automation project, the automated steering of plants and network which comprises an update of the upper layer of the automation of the district heating system from a traditional Supervisory Control and Data … Näytä hankinnat »
2020-06-01   Request for Information — Technical Consulting Services (Fortum Power and Heat Oy)
Fortum is looking for consultants that can strengthen our performance in investment projects and to some extent also in our daily operations. The consultant's general area of competence should be of a technical nature, with special focus having experience providing technical consulting services within Fortum’s business areas such as heating and cooling, heat pumps, solar, wind, hydro, nuclear power, automation and control systems, general civil work management, mechanical engineering, electrical … Näytä hankinnat »
2020-04-17   Ambient Air-to-Water Heat Pump Pilot Plant in Vermo, Espoo (Fortum Power and Heat Oy)
Fortum intends to construct a container/module based ambient air-to-water pilot plant in Vermo, Espoo. The pilot plant will produce district heating and cooling throughout the year. The cooling and heating capacity of the pilot plant is 1 Mw. Näytä hankinnat »
Mainitut toimittajat: Oilon Oy
2020-03-05   Fuel Handling System for RDF (Fortum Power and Heat Oy)
Fuel handling System to enable Refuse Derived Fuel (RDF) utilization in boiler power plant. Näytä hankinnat »
2019-12-17   Lasikuituputkiurakka (Finnoo III-projekti) (Fortum Power and Heat Oy)
Lasikuituisten vedensiirtoprosessiputkien valmistaminen, toimitukset ja asennukset kannakkeille. Osallistumishakemus täytetään kohdan I.3) linkistä avautuvassa hankitaportaalissa. Osallistumishakemus on jätettävä pyydettyine liitteineen 7.1.2020 klo 16:00 mennessä. Näytä hankinnat »
2019-07-03   Tendering of Metering Equipment for District Heating Networks (Fortum Power and Heat Oy)
The object relates to a Framework Agreement with the Fortum Power and Heat Oy (Fortum) Group for the Customer’s purchase of metering equipment and its accessories installed underground, indoors and in tunnels for Fortum’s distribution of district heating and cooling. Target to establish national Frame Agreements locally. Näytä hankinnat »
2019-05-17   Industrial Sewage Heat Pump (Fortum Power and Heat Oy)
Treated sewage industrial heat pump with the output of 20-25 MW to be located in purchaser's existing Suomenoja heat pump plant to serve the heat production for purchaser's district heating network in Espoo, Finland. To apply the participation to tendering please open the web link defined in Chapter I.3) sign in and fill in required information for Tenderer's Minimum Requirements by 7.6.2019 at 16:00. Näytä hankinnat »
Mainitut toimittajat: Friotherm AG
2019-01-11   Fortumin kaukolämpö- ja kaukokylmäverkon sekä maakaasuverkon mittaroinnin kunnossapito ja uudisasennukset (Fortum Power and Heat Oy)
Fortum hakee kumppania vastaamaan kaukolämmön, kaukokylmän ja maakaasun energiamittaroinnin toteutuksesta kohteissa. Työ sisältää mm. mittareiden asennuksia ja vaihtoja, konnektiviteettiratkaisujen kytkentää, asiakkaiden opastuksia sekä vianetsintää. Lisäksi mittauslaitevaraston hallinta tulee valitun kumppanin vastuulle. Näytä hankinnat »
2017-12-19   Boiler Wall Openings (Fortum Power and Heat Oy)
Boiler wall opening frames and their installation work to enable 4 new burners and 4 OFA units assembly to a boiler. Näytä hankinnat »
2017-12-19   Fuel handling System for solid biofuel (Fortum Power and Heat Oy)
Delivery of solid biofuel fuel handling system for a heat boiler plant which fuel power will be 49 MW. Näytä hankinnat »
2017-12-19   Biofuel Boiler and Flue Gas Condensing Plant (Fortum Power and Heat Oy)
Delivery of 49 MW (fuel power) solid biofuel fired bubbling fluidised bed hot water boiler plant including flue gas condensing unit. Näytä hankinnat »
2017-07-10   Kaukolämpöverkon maanrakennustyöt Joensuun kaukolämpöverkkoalueella (Fortum Power and Heat Oy)
Kaukolämpöverkoston liittymä- ja ylläpitorakentamisen maanrakennustyöt Fortum Power and Heat Oy:n verkkoalueilla Joensuussa urakka-aikana 1.10.2017 – 31.3.2019. Lisäksi sopimus sisältää mahdollisuuden 2 x 2 vuoden optiokausiin. Näytä hankinnat »
2017-06-30   Varalämmön toimitus Fortum Power and Heat Oy:n kaukolämpöverkoille (Fortum Power and Heat Oy)
Varalämpökapasiteetin varallaolo ja toimitus Fortum Power and Heat Oy:n kaukolämpöverkoille tuotannon mahdollisessa häiriötilanteissa. Näytä hankinnat »
Mainitut toimittajat: Höyrytys Oy
2017-06-26   Ilmasuuttimien uusinta ja painerungon muutostyöt naantalin voimalaitoksen 3-kattilalla (Fortum Power and Heat Oy)
Urakka käsittää seuraavat toimenpiteet Naantalin voimalaitoksen 3-kattilalle: 1. Hiilipölypolttimien ilma- ja OFA-suuttimien esivalmistus, purku ja asennus varusteineen. 2. Tulipesän hiilipöly-, öljy-, OFA-suuttimien ja liekinvalvojien väistöputkien esivalmistus, purku ja asennus varusteineen. 3. Hiilipölypolttimien liekinvalvojien asennusosien esivalmistus, purku asennusosia varten ja mekaaninen asennus varusteineen. Työn toteutus kesäseisokissa 2018. Näytä hankinnat »
2016-10-20   Kaukolämpöverkkorakentamisen vuosiurakat (Fortum Power and Heat Oy)
Kaukolämpö- ja kaukokylmäverkoston liittymä- ja ylläpitorakentaminen Fortum Power and Heat Oy:n verkkoalueilla urakka-aikana 1.4.2017 – 31.3.2019. Lisäksi sopimus sisältää mahdollisuuden 2 x 2 vuoden optiokausiin. Urakka-alueita on kolme: 1. Espoo (Espoo, Kauniainen ja Kirkkonummi); 2. Keski-Uusimaa (Tuusula ja Järvenpää); 3. Joensuu. Urakka-alueet jaetaan kolmeen erillisurakkaan: A. Maanrakennustyöt (urakka-alueet 1-3); B. Putkityöt (urakka-alueet 1-2); C. Eristystyöt (urakka-alueet 1-2). Näytä hankinnat »
Mainitut toimittajat: Maalinja Oy Paajanti Oy Turun Asennus ja Luokkahitsarit Oy
2015-09-21   Fuel Handling System for special solid bio fuel (horse manure) (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is starting a project to use horse manure as partial fuel in the Power Plant of Järvenpää, Finland. For this we need a Fuel Handling System which scope includes 200 m³ silo for horse manure fuel storing, conveyors and screws capacity of 5-50 m³/h needed for fuel feeding, and included also needed accessories such as instruments and electric motors. Installation and commissioning is also in supplier's scope. On purchaser's responsibility stays civil works, electrification and … Näytä hankinnat »
2015-07-10   Renewal of district heat exchangers in Joensuu Power Plant (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to renew a district heat exchangers to 199 MW (fuel) CHP Power Plant in Joensuu, Finland. Power plant delivers district heat to city of Joensuu. In Joensuu Power Plant there is a two straight tube model district heat exchangers, which maximum capacity is 120 MW. District heat water is in tube side and maximum operating values are 16 bar and 130 °C. In shell-side heat transfer medium is low pressure steam that is coming from steam turbine, maximum operating values are … Näytä hankinnat »
Mainitut toimittajat: Sahala Works Oy
2015-07-03   Kiinteistöpalvelut Fortum Heat Suomen voimalaitoksille (Fortum Power and Heat Oy)
Tämä hankinta koskee Fortum Power and Heat Oy:n Suomenojan (Espoo), Joensuun, Järvenpään ja Naantalin voimalaitoksien kiinteistöpalveluita. Kilpailutuksen piiriin kuuluvat seuraavat palvelut: siivoaminen, ulkoalueiden hoito, jätehuolto ja yleiskiinteistönhoito. Toimittajat voivat tarjota joko yhtä palvelua yhdellä paikkakunnalla, yhtä tai useampaa palvelua valitsemillaan paikkakunnilla tai kaikkia palveluita kaikilla paikkakunnilla. Kiinteistöpalveluista kiinnostuneita yrityksiä pyydetään ilmoittautumaan … Näytä hankinnat »
Mainitut toimittajat: ESN EnergieSystemeNord GmbH H.P. Gauff Ingenieure GmbH & Co. KG -JBG- IVU Ingenieurbüro für Versorgungs- und... KBI – Kirchner Beratende Ingenieure GmbH PLE Pipeline Engineering GmbH
2015-06-02   Renewal of secondary air preheater in Joensuu Power Plant (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to renew a secondary air preheater to 199 MW (fuel) Power Plant in Joensuu, Finland. Power Plant's BFB boiler is biomass and peat fired. The purpose of the air preheater is to recover the heat from the boiler flue gas which increases the thermal efficiency of the boiler by reducing the useful heat lost in the flue gas. The present secondary air preheater manufactured by By-Cast origin from year 2000 is degraded and corroded. Delivery will be turn-key delivery. … Näytä hankinnat »
2015-04-08   Puupellettien kuljetuspalvelu (Fortum Power and Heat Oy)
Fortum on muuttamassa Espoon Kivenlahden lämpölaitoksensa käyttämään puupellettejä ja etsii kumppaniksi kuljetusliikettä pellettien kuljettamiseksi Inkoon sataman varastosta Kivenlahteen. Käyttö alkaa suunnitelman mukaan marraskuussa 2015. Arvioitu pellettien käyttömäärä ja kuljetusmäärä on vuositasolla pienimmillään noin 10 000 t / 17 000 irto-m³ ja suurimmillaan jopa noin 85 000 t / 140 000 irto-m³. Pelletiä käytetään enimmillään viikossa n. 3 200 t. Pääosa käytöstä ja kuljetustarpeesta on lokakuun … Näytä hankinnat »
Mainitut toimittajat: Karjaan Kuorma-Autokeskus Oy
2015-01-23   District heating water accumulator tank 5 000 m (Fortum Power and Heat Oy)
Fortum Power and Heat Oy will build a District Heat Accumulator in Järvenpää Power Plant in Finland. Scope of the delivery will be a 5 000 m district heating water accumulator tank made of carbon steel including planning, materials, delivery, installation and thermal insulation of the tank. Purchaser will be responsible for building the foundation to the tank. Exact specification and delivery limits of the tank will be defined in the Purchase Request. Näytä hankinnat »
2014-11-11   District heating pumps (Fortum Power and Heat Oy)
Fortum Power and Heat Oy will replace two district heating pumps in Suomenoja Power Plant SO1-unit. Purchase includes following positions: Näytä hankinnat »
2014-08-29   49MW water tube heat boiler plant (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to build a LFO fired 49MW(fuel) hot water boiler plant in Joensuu, Finland. Final investment decision for the project is not yet made, it will be done after receiving the binding offers. The project is turn-key delivery for HOB plant with one light fuel oil fired 49MW water tube boiler and all the needed auxiliaries, piping works, electrification, automation and instrumentation to make boiler plant functional. Purchaser will be in charge for civil works (excavation, … Näytä hankinnat »