Hankinnan kuvaus
The procurement includes an attachment system for automooring ships utilising negative pressure and vacuum coupling, as well as the delivery, installation, testing and operation training for the system at the Ports of Turku and Mariehamn. Port of Turku requires six (6) automooring devices with control systems and software installed on ready ground for use at separately specified ferry berth V1. The anticipated total value of the acquisition is 3 000 000 EUR.
The tendered arrangement must include the following:
— one (1) on-land control and diagnostic system (main station),
— two (2) control systems to be placed on the vessels,
— remote diagnostics for the warranty period,
— shipping and packaging costs, transport and haulage costs, customs duties, import clearance, taxes and other possible cargo fees and payments imposed by authorities,
— assembly (labour) on site after unpacking,
— equipment installation (labour), including levelling the foundation and connecting the accessories (electric and hydraulic accessories) to the equipment,
— commissioning and training, operating instructions and maintenance instructions Port of Mariehamn requires six (6) automooring devices with control systems and software installed on a ready ground for use at separately specified ferry berth 3. The anticipated total value of the acquisition is 3 000 000 EUR.
The tendered arrangement must include the following:
— one (1) on-land control and diagnostic system (main station),
— nine (9) control systems to be placed on the vessels,
— remote diagnostics for the warranty period,
— shipping and packaging costs, transport and haulage costs, customs duties, import clearance, taxes and other possible cargo fees and payments imposed by authorities,
— assembly (labour) on site after unpacking,
— equipment installation (labour), including levelling the foundation and connecting the accessories (electric and hydraulic accessories) to the equipment,
— commissioning and training, operating instructions and maintenance instructions.
The anticipated total value of the acquisition is 6 000 000 EUR. The entire procurement for the Port of Mariehamn, including the automooring system and equipment, must be installed and operational by the end of April 2020. The entire procurement for the Port of Turku, including the equipment, must be installed and operational by the end of September 2020.