Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3. This contract notice is published to purchase of NSL3 Heat Pump Plant of CCW System. This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil works.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2020-10-25.
Hankinta julkaistiin 2020-10-07.
Toimittajat
Seuraavat toimittajat mainitaan hankintapäätöksissä tai muissa hankinta-asiakirjoissa:
hankintailmoitus (2020-10-07) Kohde Hankinnan laajuus
Otsikko: Lämpöpumput
Viitenumero: NSL3-T014
Lyhyt kuvaus:
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3.
This contract notice is published to purchase of NSL3 Heat Pump Plant of CCW System.
This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil works.
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3.
This contract notice is published to purchase of NSL3 Heat Pump Plant of CCW System.
This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil works.
Ilmoituksen metatiedot
Alkukieli: englanti 🗣️
Asiakirjatyyppi: hankintailmoitus
Sopimuksen luonne: Tavarat
Asetus: Euroopan unioni ja WTO-maat
Yhteinen hankintanimikkeistö (CPV)
Koodi: Lämpöpumput📦
Lisä-CPV-koodi: Lämpöpumput📦 Suorituspaikka
NUTS-alue: Pirkanmaa
🏙️
Menettely
Menettelyn tyyppi: Neuvottelumenettely
Tarjouksen tyyppi: Tarjous koskee kaikkia eriä
Myöntämisperusteet
Kokonaistaloudellisesti edullisin tarjous
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3.
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3.
This contract notice is published to purchase of NSL3 Heat Pump Plant of CCW System.
This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil…
… works.
… works. The scope of the delivery is specified in the Invitation to Tender.
Kesto: 22 kuukautta
Vaihtoehtojen kuvaus: Additional maintenance contract.
Suorituspaikka
Pääkohde tai suorituspaikka: Tampere, Naistenlahti Power Plant.
Oikeudelliset, taloudelliset, rahoitukselliset ja tekniset tiedot Osallistumisehdot
Kelpoisuus harjoittaa ammattitoimintaa:
Requirements are presented in the invitation to participation document which is an appendix of this contract notice (the document is also available in Buildercom system).
Luettelo ja lyhyt kuvaus säännöistä ja kriteereistä:
Requirements are presented in the invitation to participation document which is an appendix of this contract notice (the document is also available in Buildercom system).
Menettely
Oikeusperusta: 32014L0025
Ehdokkaiden vähimmäismäärä: 3
Ehdokkaiden enimmäismäärä: 5
Objektiiviset kriteerit rajoitetun ehdokasjoukon valitsemiseksi: Resources of the contracting entity.
Tarjousten vastaanottoaika: 23:45
Kielet, joilla tarjoukset tai osallistumishakemukset voidaan jättää: englanti 🗣️
Tarjouksen voimassaoloaika: 2 kuukautta
Täydentävät tiedot Arvostelurunko
Nimi: Markkinaoikeus
Postiosoite: Radanrakentajantie 5
Postitoimipaikka: Helsinki
Postinumero: 00520
Maa: Suomi 🇫🇮
Puhelin: +358 295643300📞
Sähköposti: markkinaoikeus@oikeus.fi📧
Internetosoite: http://www.oikeus.fi/markkinaoikeus🌏
Lähde: OJS 2020/S 198-480990 (2020-10-07)
Ilmoitus tehdystä sopimuksesta (2021-03-11) Kohde Hankinnan laajuus
Lyhyt kuvaus:
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3.
This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The Supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil works.
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3.
This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The Supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil works.
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3.
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3.
This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The Supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil works.
This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The Supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil works.