Oulun Energia Oy has awarded Pöyry with EPCM-services for the new Laanila OEBIO-project in Oulu, Finland. The construction of the new power plant will be completed in late 2020 and once in operation it will replace Toppila 1 unit. Capacity of the plant will be around 70 MW electricity and around 175 MW district heat with an option to supply steam to clients in the Laanila industrial area. The plant uses forest based biofuels, peat and solid recovered fuel (SRF) as fuels. This supply consists following piping systems:
— DH-condensate system,
— condensate treatment system,
— district heating system,
— DH expansion and pressurising system,
— condensate preheating system,
— closed cooling water system,
— cooling water system,
— raw water system,
— make-up water system,
— fuel oil system,
— compressed air system basic piping engineering result: ~ 6,5 km/160 tons of piping materials and ~ 85 tons of primary/secondary supports.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2019-02-19.
Hankinta julkaistiin 2019-02-01.
Toimittajat
Seuraavat toimittajat mainitaan hankintapäätöksissä tai muissa hankinta-asiakirjoissa:
Kohde Hankinnan laajuus
Otsikko: Laanila Low Pressure Piping
101007711-F0072A
Tuotteet/palvelut: Putket ja putkistot📦
Lyhyt kuvaus:
“Oulun Energia Oy has awarded Pöyry with EPCM-services for the new Laanila OEBIO-project in Oulu, Finland. The construction of the new power plant will be...”
Lyhyt kuvaus
Oulun Energia Oy has awarded Pöyry with EPCM-services for the new Laanila OEBIO-project in Oulu, Finland. The construction of the new power plant will be completed in late 2020 and once in operation it will replace Toppila 1 unit. Capacity of the plant will be around 70 MW electricity and around 175 MW district heat with an option to supply steam to clients in the Laanila industrial area. The plant uses forest based biofuels, peat and solid recovered fuel (SRF) as fuels. This supply consists following piping systems:
— DH-condensate system,
— condensate treatment system,
— district heating system,
— DH expansion and pressurising system,
— condensate preheating system,
— closed cooling water system,
— cooling water system,
— raw water system,
— make-up water system,
— fuel oil system,
— compressed air system basic piping engineering result: ~ 6,5 km/160 tons of piping materials and ~ 85 tons of primary/secondary supports.
1️⃣
Suorituspaikka: Pohjois-Pohjanmaa🏙️
Pääkohde tai suorituspaikka: Laanila industrial park. Site address: Typpitie 3, 90620 Oulu, FINLAND.
Hankinnan kuvaus:
“Scope of work includes:
— pipes and pipe parts (including for example bends, elbows, reducers, Y-pieces, T-pieces, condensate pockets) material,...”
Hankinnan kuvaus
Scope of work includes:
— pipes and pipe parts (including for example bends, elbows, reducers, Y-pieces, T-pieces, condensate pockets) material, prefabrication and installation,
— installation of piping related equipment, for example valves, pumps, filters, small vessels, etc.,
— primary and secondary supports,
— scaffolding,
— all needed documentation according PED 2014 and EN13480.
The following detail design is included in the suppliers' scope of work:
— final stress analysis and strength calculations, the purchaser will deliver preliminary stress analysis,
— non-standard pieces, calculation and workshop drawings,
— the supplier will make detail design to the purchaser's PDMS 3D-model on the purchaser's preliminary design,
— detailed engineering includes also updating 3D-model according to purchased equipment, valves, pumps, filters, small vessels, etc.,
— detail isometric drawings,
— detail support drawings.
Note: piping supplier is the fabricator of the piping and shall give CE-marking of its scope of work according PED2014. The design, all works, testing and inspections shall be done according to EN13480.
Näytä lisää Myöntämisperusteet
Hinta
Sopimuksen, puitesopimuksen tai dynaamisen hankintajärjestelmän kesto
Jäljempänä oleva aikataulu on ilmaistu kuukausina.
Kuvaus
Kesto: 20
Tietoa vaihtoehdoista
Vaihtoehdot ✅
Vaihtoehtojen kuvaus:
“Low pressure steam piping; connection to old plant — process condensate system — mill gas system.”
Oikeudelliset, taloudelliset, rahoitukselliset ja tekniset tiedot Osallistumisehdot
Luettelo ja lyhyt kuvaus olosuhteista:
“Oulun Energia is entitled to exclude a candidate that does no meet the criteria set forth below, or gives false information to Oulun Energia.
1) The...”
Luettelo ja lyhyt kuvaus olosuhteista
Oulun Energia is entitled to exclude a candidate that does no meet the criteria set forth below, or gives false information to Oulun Energia.
1) The candidate or a person having representation, decision-making or supervisory rights with respect to the candidate, as well as the subcontractors used by the candidate have not been declared guilty in offences of corruptive nature, in fraudulent actions in financial matters, in money laundering or participation in criminal organization by a valid court judgement that appears from the criminal record;
2) The candidate has not been declared insolvent, its business activities have not been suspended or discontinued or legal proceedings have not been started on the candidate’s bankruptcy or it has not been found out that up to the expected completion date of the contract the candidate is going to be liquidated; 3) The candidate does not have tax or state compulsory social insurance payment debts in Finland or in another country where it is registered or in the country of its residence;
4) The candidate is registered to the trade register, commercial register or equal register of its country of incorporation: copy of the registration certificate issued by the relevant institution in Finland or the country of the candidate’s incorporation must be submitted. Contractor’s obligations and liability will be checked and it must be fulfilled before contract can be signed (according to the Act 1233/2006). If the candidate is a consortium, each member of the consortium shall fulfill these general criteria. Also possible subcontractors shall fulfill such criteria.
Näytä lisää Taloudellinen ja rahoituksellinen asema
Luettelo ja lyhyt kuvaus valintaperusteista:
“Criteria(s) to be fulfilled:
— the company's turnover need to be at least six (6) million EUR during the last 3 years. Document(s) to be submitted:...”
Luettelo ja lyhyt kuvaus valintaperusteista
Criteria(s) to be fulfilled:
— the company's turnover need to be at least six (6) million EUR during the last 3 years. Document(s) to be submitted: statement signed by the candidate concerning the average financial turnover of the candidate excluding VAT for the period of last three (3) financial years (2015, 2016 and 2017/3 latest financial years of the candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation,
— financial statements of the candidate for the period of last three (3) financial years (2015, 2016 and 2017/3 latest financial years of the candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation. The Contracting Entity reserves the right to make a credit risk control checking from a solid corporation e.g. Suomen Asiakastieto or similar and if the risk class is bigger than 3, as put forth in Asiakastieto, the candidate can be excluded.
Näytä lisää Tekninen ja ammatillinen pätevyys
Luettelo ja lyhyt kuvaus valintaperusteista:
“1) Minimum reference requirement: these references refer to the minimum references which affect the selection of the candidates;
2) The candidate has...”
Luettelo ja lyhyt kuvaus valintaperusteista
1) Minimum reference requirement: these references refer to the minimum references which affect the selection of the candidates;
2) The candidate has experience in at least two (2) similar supplies of process piping contracts in power plants, chemical industry manufacturing plants, forest industry production plants, or similar plants that are valued at least 2 000 000 EUR (VAT 0 %) during the last eight (8) years in EU region. Including full responsibility for engineering, manufacture, installation, commissioning and testing according to EN13480 standard. Including module G or module H: conformity based on unit verification or on full quality assurance as the evaluation method of the supplies, and they have also included equipment installations;
2) The candidate must provide detail engineering by PDMS 3D-modelling/design;
3) The candidate must have a valid certified quality assurance system (ISO-9001 or equivalent) and quality requirements for welding (ISO 3834);
4) The contractor must have a maintenance and spare parts center in Europe and maintenance must be available in Oulu within forty eight (48) hours of contacting;
5) The contractor's key personnel (project manager, site manager and welding coordinator) must be fluent in spoken and written Finnish language.
Näytä lisää Osallistumisehdot
Vaadittavat vakuudet ja takuut: Will be specified in Call for Tenders.
Tärkeimmät rahoitusehdot ja maksujärjestelyt ja/tai viittaus niitä koskeviin säännöksiin: Will be specified in Call for Tenders.
Oikeudellinen muoto, joka sen taloudellisten toimijoiden ryhmittymän, jonka kanssa hankintasopimus tehdään, on otettava: Limited company (Ltd or Plc) or equal.
Menettely Toimenpiteen tyyppi
Neuvottelumenettely, johon liittyy edeltävä kilpailuttaminen
Hallinnolliset tiedot
Tarjousten tai osallistumishakemusten vastaanottamisen määräaika: 2019-02-19
13:00 📅
Kielet, joilla tarjoukset tai osallistumishakemukset voidaan jättää: englanti 🗣️
Kielet, joilla tarjoukset tai osallistumishakemukset voidaan jättää: suomi 🗣️
Jäljempänä oleva aikataulu on ilmaistu kuukausina.
Vähimmäisaika, jonka kuluessa tarjoajan on pidettävä tarjous voimassa: 3
Täydentävät tiedot Lisätietoja
“The contracting entity reserves the right to invite to the procurement procedure a minimum of 3 to 5 (3–5) bidders. If there is more than three (3) bidders,...”
The contracting entity reserves the right to invite to the procurement procedure a minimum of 3 to 5 (3–5) bidders. If there is more than three (3) bidders, the contracting entity reserves the right to select those 3 to 5 (3–5) bidders that have the largest number of eligible references, as mentioned in section III.1.3) point 2, during the last eight (8) years. The candidate must meet all the requirements set out in section III.1.3). Any qualification is made in such a way that the candidates to be selected to the bidding process are ranked based on the number of references. The equivalence and number of references are evaluated based on the written report submitted by the candidate (reference form, Annex 2).
Ilmoitus tehdystä sopimuksesta (2019-09-23) Kohde Hankinnan laajuus
Lyhyt kuvaus:
“Oulun Energia Oy has awarded Pöyry with EPCM-services for the new Laanila OEBIO-project in Oulu, Finland. The construction of the new power plant will be...”
Lyhyt kuvaus
Oulun Energia Oy has awarded Pöyry with EPCM-services for the new Laanila OEBIO-project in Oulu, Finland. The construction of the new power plant will be completed in late 2020 and once in operation it will replace Toppila 1 unit. Capacity of the plant will be around 70 MW electricity and around 175 MW district heat with an option to supply steam to clients in the Laanila industrial area. The plant uses forest based biofuels, peat and solid recovered fuel (SRF) as fuels. This supply consists following piping systems:
— DH-condensate system,
— condensate treatment system,
— district heating system,
— DH expansion and pressurising system,
— condensate preheating system,
— closed cooling water system,
— cooling water system,
— raw water system,
— make-up water system,
— fuel oil system,
— compressed air system basic piping engineering result:
—— 6,5 km/160 tons of piping materials, and
—— 85 tons of primary/secondary supports.
Näytä lisää Kuvaus
Pääkohde tai suorituspaikka: Laanila industrial park Site address: Typpitie 3, 90620 Oulu, Finland.
Hankinnan kuvaus:
“Scope of work includes:
— pipes and pipe parts (including for example bends, elbows, reducers, Y-pieces, Tpieces, condensate pockets) material,...”
Hankinnan kuvaus
Scope of work includes:
— pipes and pipe parts (including for example bends, elbows, reducers, Y-pieces, Tpieces, condensate pockets) material, prefabrication and installation,
— installation of piping related equipment, for example valves, pumps, filters, small vessels, etc,
— primary and secondary supports,
— scaffolding,
— all needed documentation according PED 2014 and EN13480.
The following detail design is included in the suppliers's scope of work:
— final stress analysis and strength calculations, the purchaser will deliver preliminary stress analysis,
— non-standard pieces, calculation and workshop drawings,
— the supplier will make detail design to the Purchaser's PDMS 3D-model on the purchaser's preliminary design,
— detailed engineering includes also updating 3D-model according to purchased equipment, valves, pumps, filters, small vessels, etc.,
— detail isometric and support drawings.
Piping supplier is the fabricator of the piping and shall give CE-marking.
Näytä lisää Tietoa vaihtoehdoista
Vaihtoehtojen kuvaus:
“— low pressure steam piping; connection to old plant,
— process condensate system,
— mill gas system.”
Menettely Hallinnolliset tiedot
Tätä menettelyä koskeva aiempi julkaisu: 2019/S 025-056601
Sopimuksen tekeminen
1️⃣
Otsikko: Laanila Low Pressure Piping
Sopimuksen tekopäivä: 2019-04-23 📅
Tietoa tarjouskilpailuista
Saatujen tarjousten määrä: 2
Pk-yrityksiltä saatujen tarjousten määrä: 1
Muista EU:n jäsenvaltioista tulevilta tarjoajilta saatujen tarjousten määrä: 0
EU:n ulkopuolisista maista tulevilta tarjoajilta saatujen tarjousten määrä: 0
Sähköisesti vastaanotettujen tarjousten määrä: 2
Toimeksisaajan nimi ja osoite
Nimi: Betamet Piping Oy
Kansallinen rekisterinumero: 2043260-1
Postitoimipaikka: Oulu
Maa: Suomi 🇫🇮
Alue: Pohjois-Pohjanmaa🏙️
Toimeksisaaja on pk-yritys ✅
Lähde: OJS 2019/S 184-449317 (2019-09-23)