Fully operational dry (no liquid helium needed) dilution refrigerator (DR) with gas handling system and computer control. Turn-the-key delivery: All equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Required helium-mixture should also be included. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher. Contracting authority (JYU) may suspend the procurement procedure if the tenders exceed the budget available for the procurement. Prior references of supplying comparable systems are required.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2020-01-06.
Hankinta julkaistiin 2019-11-28.
Toimittajat
Seuraavat toimittajat mainitaan hankintapäätöksissä tai muissa hankinta-asiakirjoissa:
hankintailmoitus (2019-11-28) Kohde Hankinnan laajuus
Otsikko: Laboratoriolaitteet, optiset ja tarkkuuslaitteet (lukuun ottamatta silmälaseja)
Viitenumero: 1011/02.08.00.00/2019
Lyhyt kuvaus:
Fully operational dry (no liquid helium needed) dilution refrigerator (DR) with gas handling system and computer control. Turn-the-key delivery: All equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Required helium-mixture should also be included. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher. Contracting authority (JYU) may suspend the procurement procedure if the tenders exceed the budget available for the procurement. Prior references of supplying comparable systems are required.
Fully operational dry (no liquid helium needed) dilution refrigerator (DR) with gas handling system and computer control. Turn-the-key delivery: All equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Required helium-mixture should also be included. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher. Contracting authority (JYU) may suspend the procurement procedure if the tenders exceed the budget available for the procurement. Prior references of supplying comparable systems are required.
Menettely
Menettelyn tyyppi: Avoin menettely
Tarjouksen tyyppi: Tarjous koskee kaikkia eriä
Myöntämisperusteet
Kokonaistaloudellisesti edullisin tarjous
Fully operational dry (no liquid helium needed) dilution refrigerator with gas handling system and computer control. Turn-the-key delivery: all equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Installation and testing of the system at installation location should be included. Required helium-mixture should also be included. There should be automated (computer controlled) cool down and warm up procedures with possibility to switch system to manual control. Temperature PID control below 100 mK must be able to maintain less than 1 mK accuracy of the temperature. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher, at 100 mK 400 μW or higher and at 4,2 K 1,8 W or higher. Cool down time should not exceed 24 hours. Wiring to be installed includes 24 twisted pair wires, 12 thermocoax wires, 4 semi-rigid cables up to 18 GHz and 2 semi-rigid cables up to 40 GHz. In addition to electrical wiring, there must be optical free-space access to the sample space both horizontally and vertically. Special care will be paid to the vibration dampening solutions of the tenders. In addition to the normal requirement to separate the pulsetube vibrations from the sample space, there should be a possibility to run the system for an extended period (at least 60 minutes) without the pulsetube running. Contracting authority (JYU) may suspend the procurement procedure if the tenders exceed the budget available for the procurement. Prior references of supplying comparable systems are required.
Fully operational dry (no liquid helium needed) dilution refrigerator with gas handling system and computer control. Turn-the-key delivery: all equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Installation and testing of the system at installation location should be included. Required helium-mixture should also be included. There should be automated (computer controlled) cool down and warm up procedures with possibility to switch system to manual control. Temperature PID control below 100 mK must be able to maintain less than 1 mK accuracy of the temperature. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher, at 100 mK 400 μW or higher and at 4,2 K 1,8 W or higher. Cool down time should not exceed 24 hours. Wiring to be installed includes 24 twisted pair wires, 12 thermocoax wires, 4 semi-rigid cables up to 18 GHz and 2 semi-rigid cables up to 40 GHz. In addition to electrical wiring, there must be optical free-space access to the sample space both horizontally and vertically. Special care will be paid to the vibration dampening solutions of the tenders. In addition to the normal requirement to separate the pulsetube vibrations from the sample space, there should be a possibility to run the system for an extended period (at least 60 minutes) without the pulsetube running. Contracting authority (JYU) may suspend the procurement procedure if the tenders exceed the budget available for the procurement. Prior references of supplying comparable systems are required.
Kesto: 48 kuukautta
Vaihtoehtojen kuvaus:
Service and support: tenderer indicates service contract prices for extra 5 years and type of support. Possibility for future upgrades and expansions: option to include an integrated superconducting, possibly vector, magnet at a later date.
EU:n rahoittaman hankkeen tai ohjelman nimi: Horizon 2020 Grant Agreement number: 852428
Suorituspaikka
Pääkohde tai suorituspaikka: University of Jyväskylä, Nanoscience Center/Department of Physics.
Oikeudelliset, taloudelliset, rahoitukselliset ja tekniset tiedot Osallistumisehdot
Kelpoisuus harjoittaa ammattitoimintaa: According to tender documents.
Sopimuksen toteuttaminen
Sopimuksen täytäntöönpanoehdot:
Contracting authority (JYU) may suspend the procurement procedure if the tenders exceed the budget available for the procurement.
Menettely
Oikeusperusta: 32014L0024
Tarjousten vastaanottoaika: 16:00
Kielet, joilla tarjoukset tai osallistumishakemukset voidaan jättää: englanti 🗣️
Tarjouksen voimassaoloaika: 6 kuukautta
Tarjousten avauspäivä: 2020-01-07 📅
Tarjousten avausaika: 10:00
Ilmoitus tehdystä sopimuksesta (2020-01-17) Kohde Hankinnan laajuus
Lyhyt kuvaus:
Fully operational dry (no liquid helium needed) dilution refrigerator (DR) with gas handling system and computer control. Turn-the-key delivery: all equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Required helium-mixture should also be included. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher. Contracting authority (JYU) may suspend the procurement procedure if the tenders exceed the budget available for the procurement. Prior references of supplying comparable systems are required.
Fully operational dry (no liquid helium needed) dilution refrigerator (DR) with gas handling system and computer control. Turn-the-key delivery: all equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Required helium-mixture should also be included. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher. Contracting authority (JYU) may suspend the procurement procedure if the tenders exceed the budget available for the procurement. Prior references of supplying comparable systems are required.
Fully operational dry (no liquid helium needed) dilution refrigerator with gas handling system and computer control. Turn-the-key delivery: all equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Installation and testing of the system at installation location should be included. Required helium-mixture should also be included. There should be automated (computer controlled) cool down and warm up procedures with possibility to switch system to manual control. Temperature PID control below 100 mK must be able to maintain less than 1 mK accuracy of the temperature. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher, at 100 mK 400 μW or higher and at 4,2 K 1,8 W or higher. Cool down time should not exceed 24 hours.
Fully operational dry (no liquid helium needed) dilution refrigerator with gas handling system and computer control. Turn-the-key delivery: all equipment needed to run the system as well as all needed supporting structures, floor mounts, etc. delivered with the system. Installation and testing of the system at installation location should be included. Required helium-mixture should also be included. There should be automated (computer controlled) cool down and warm up procedures with possibility to switch system to manual control. Temperature PID control below 100 mK must be able to maintain less than 1 mK accuracy of the temperature. Base temperature must be below 10 mK with all factory installed wiring and the cooling power at 20 mK should be 14 μW or higher, at 100 mK 400 μW or higher and at 4,2 K 1,8 W or higher. Cool down time should not exceed 24 hours.
Vaihtoehtojen kuvaus:
Option to include an integrated superconducting, possibly vector, magnet at a later date. Vibration isolation options.