Pori Energia Oy is investing for new biomass power plant in Aittaluoto. The construction of the new power plant will be completed by mid-2020 and once in operation it will replace some of the boiler capacity at Aittaluoto. Capacity of the boiler will be around 90 MW and it will supply heat to the city of Pori, process steam to neighbouring industrial clients and power to the grid. The new plant uses biofuels, peat and can also use solid recovered fuel (SRF). This supply consists of Steam piping contract includes following systems:
— main steam (13,9 MPa, 545 degC), material X10CrMoVNb9-1, DN size up to 250,
— 15 bar reduction steam (1,7 MPa, 501 degC) 13CrMo4-5, DN size up to 200,
— 15 bar steam distribution (1,7 MPa, 275 degC), DN size up to 200,
— 3,5 bar reduction steam (0,5 MPa, 501 degC) 13CrMo4-5, DN size up to 600,
— 3,5 bar steam distribution (0,5 MPa, 250 degC), DN size up to 700,
— safety valve and silencer piping,
— drain piping with steam traps and header.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2018-07-12.
Hankinta julkaistiin 2018-06-25.
Toimittajat
Seuraavat toimittajat mainitaan hankintapäätöksissä tai muissa hankinta-asiakirjoissa:
Ilmoitus tehdystä sopimuksesta (2019-01-09) Hankintaviranomainen Nimi ja osoitteet
Nimi: Pori Energia Oy
Kansallinen rekisterinumero: 0790442-4
Postiosoite: Radanvarsi 2
Postitoimipaikka: Pori
Postinumero: 28100
Maa: Suomi 🇫🇮
Yhteyshenkilö: Hannu Turunen
Puhelin: +358 447012218📞
Sähköposti: hannu.turunen@porienergia.fi📧
Alue: Satakunta🏙️
URL: http://www.porienergia.fi/🌏
Kohde Hankinnan laajuus
Otsikko: Steam Piping
101007990-F0012A
Tuotteet/palvelut: Putket ja putkistot📦
Lyhyt kuvaus:
“Pori Energia Oy is investing for new biomass power plant in Aittaluoto. The construction of the new power plant will be completed by mid-2020 and once in...”
Lyhyt kuvaus
Pori Energia Oy is investing for new biomass power plant in Aittaluoto. The construction of the new power plant will be completed by mid-2020 and once in operation it will replace some of the boiler capacity at Aittaluoto. Capacity of the boiler will be around 90 MW and it will supply heat to the city of Pori, process steam to neighbouring industrial clients and power to the grid. The new plant uses biofuels, peat and can also use solid recovered fuel (SRF). This supply consists of Steam Piping contract includes following systems:
— main steam (13,9 MPa, 545 degC), material X10CrMoVNb9-1, DN size up to 250,
— 15 bar reduction steam (1,7 MPa, 501 degC) 13CrMo4-5, DN size up to 200,
— 15 bar steam distribution (1,7 MPa, 275 degC), DN size up to 200,
— 3,5 bar reduction steam (0,5 MPa, 501 degC) 13CrMo4-5, DN size up to 600,
— 3,5 bar steam distribution (0,5 MPa, 250 degC), DN size up to 700,
— safety valve and silencer piping,
— drain piping with steam traps and header.
1️⃣
Suorituspaikka: Satakunta🏙️
Hankinnan kuvaus:
“Scope of work includes:
— pipes and pipe parts (including for example bends, elbows, reducers, Y-pieces, T-pieces, condensate pockets) material,...”
Hankinnan kuvaus
Scope of work includes:
— pipes and pipe parts (including for example bends, elbows, reducers, Y-pieces, T-pieces, condensate pockets) material, prefabrication and installation,
— installation of piping related equipment, for example reduction station, valves and silencers,
— primary and secondary supports,
— scaffolding,
— all needed documentation according PED 2014, EN12952 and EN13480.
The following detail design is included in the suppliers's scope of work:
— final stress analysis and strength calculations, the purchaser will deliver preliminary stress analysis,
— non-standard pieces calculation and workshop drawings, for example live steam header, turbine transition piece,
— the supplier will make detail design to the purchaser's PDMS 3D-model on the purchaser's preliminary design,
— detail isometric drawings,
— detail support drawings
Note: Piping supplier is the fabricator of the piping and shall give CE-marking of its scope of work according PED2014.
Menettely Toimenpiteen tyyppi
Neuvottelumenettely, johon liittyy edeltävä kilpailuttaminen
Hallinnolliset tiedot
Tätä menettelyä koskeva aiempi julkaisu: 2018/S 123-280578
Sopimuksen tekeminen
1️⃣
Otsikko: Steam Piping
Sopimuksen tekopäivä: 2018-10-25 📅
Tietoa tarjouskilpailuista
Saatujen tarjousten määrä: 2
Pk-yrityksiltä saatujen tarjousten määrä: 1
Muista EU:n jäsenvaltioista tulevilta tarjoajilta saatujen tarjousten määrä: 1
Sähköisesti vastaanotettujen tarjousten määrä: 2
Toimeksisaajan nimi ja osoite
Nimi: Caverion Industria Oy
Kansallinen rekisterinumero: 1860875-1
Postitoimipaikka: Vantaa
Maa: Suomi 🇫🇮
Alue: Helsinki-Uusimaa🏙️
Toimeksisaaja on pk-yritys
Tiedot sopimuksen/erän arvosta (ilman alv:tä)
Hankintasopimuksen/kiinteistön arvioitu kokonaisarvo: EUR 2 343 127 💰
Sopimuksen/osuuden kokonaisarvo: EUR 2 343 127 💰