2018-03-26   F-S 1 Spare Cable Procurement (Fingrid Oyj)
The procurement is expected to contain design, manufacturing, testing and delivery of a 2000 meter long Mass Impregnated Non Draining (MIND) cable suitable to be used as the Fenno-Skan 1 HVDC spare cable. The cable shall be suitable for installation as a part of the existing cable, including the existing installed cable and existing spare cable. The scope of supply is expected to contain 4 (four) suitable repair joints as an option. The Fenno-Skan 1 cable is a 400kV NOVA-L 1x1200mm2 Cu HVDC double … Näytä hankinnat »