F-S 1 Spare Cable Procurement

Fingrid Oyj

The procurement is expected to contain design, manufacturing, testing and delivery of a 2000 meter long Mass Impregnated Non Draining (MIND) cable suitable to be used as the Fenno-Skan 1 HVDC spare cable.
The cable shall be suitable for installation as a part of the existing cable, including the existing installed cable and existing spare cable.
The scope of supply is expected to contain 4 (four) suitable repair joints as an option.
The Fenno-Skan 1 cable is a 400kV NOVA-L 1x1200mm2 Cu HVDC double armored submarine cable with MIND paper insulation.
Note that the spare cable suitability for the planned use must be proven.
The procurement scope of supply defined in this document is to be considered as preliminary and may be negotiated during the procurement process. For example, changes in the delivery length, testing requirements, possible delivery alternatives and the need and the number of joints may be modified during the negotiations.

Määräaika

Tarjousten vastaanottamisen määräaika oli 2018-04-12. Hankinta julkaistiin 2018-03-26.

Kuka? Mitä? Missä?
Hankintojen historia
Päivämäärä Asiakirja
2018-03-26 hankintailmoitus
2019-04-12 Ilmoitus tehdystä sopimuksesta
hankintailmoitus (2018-03-26)
Kohde
Hankinnan laajuus
Otsikko: Merenalaiset kaapelit
Viitenumero: FS1Spare
Lyhyt kuvaus:
The procurement is expected to contain design, manufacturing, testing and delivery of a 2000 meter long Mass Impregnated Non Draining (MIND) cable suitable to be used as the Fenno-Skan 1 HVDC spare cable. The cable shall be suitable for installation as a part of the existing cable, including the existing installed cable and existing spare cable. The scope of supply is expected to contain 4 (four) suitable repair joints as an option. The Fenno-Skan 1 cable is a 400kV NOVA-L 1x1200mm2 Cu HVDC double armored submarine cable with MIND paper insulation. Note that the spare cable suitability for the planned use must be proven. The procurement scope of supply defined in this document is to be considered as preliminary and may be negotiated during the procurement process. For example, changes in the delivery length, testing requirements, possible delivery alternatives and the need and the number of joints may be modified during the negotiations.
Näytä lisää
Ilmoituksen metatiedot
Alkukieli: englanti 🗣️
Asiakirjatyyppi: hankintailmoitus
Sopimuksen luonne: Tavarat
Asetus: Euroopan unioni ja WTO-maat
Yhteinen hankintanimikkeistö (CPV)
Koodi: Merenalaiset kaapelit 📦
Lisä-CPV-koodi: Kaapelinlaskualusten palvelut 📦
Suorituspaikka
NUTS-alue: Extra-Regio NUTS 1 🏙️

Menettely
Menettelyn tyyppi: Neuvottelumenettely
Tarjouksen tyyppi: Tarjous koskee kaikkia eriä
Myöntämisperusteet
Kokonaistaloudellisesti edullisin tarjous

Hankintaviranomainen
Tunnistetiedot
Maa: Suomi 🇫🇮
Hankintaviranomaisen tyyppi: Yleishyödyllisten palvelujen alalla toimiva yksikkö
Hankintaviranomaisen nimi: Fingrid Oyj
Postiosoite: Läkkisepäntie 21
Postinumero: 00620
Postitoimipaikka: Helsinki
Yhteystiedot
Internetosoite: http://www.fingrid.fi 🌏
Sähköposti: procurement.hvdc@fingrid.fi 📧
Puhelin: +358 303955274 📞
Asiakirjojen URL-osoite: http://www.fingrid.fi 🌏

Viite
Päivämäärät
Lähetyspäivä: 2018-03-26 📅
Tarjousten jättämisen määräaika: 2018-04-12 📅
Julkaisupäivä: 2018-03-27 📅
Tunnisteet
Ilmoituksen numero: 2018/S 060-133415
EUVL-S-numero: 60

Kohde
Hankinnan laajuus
Lyhyt kuvaus:
The procurement is expected to contain design, manufacturing, testing and delivery of a 2000 meter long Mass Impregnated Non Draining (MIND) cable suitable to be used as the Fenno-Skan 1 HVDC spare cable.
The cable shall be suitable for installation as a part of the existing cable, including the existing installed cable and existing spare cable.
The scope of supply is expected to contain 4 (four) suitable repair joints as an option.
The Fenno-Skan 1 cable is a 400kV NOVA-L 1x1200mm2 Cu HVDC double armored submarine cable with MIND paper insulation.
Note that the spare cable suitability for the planned use must be proven.
The procurement scope of supply defined in this document is to be considered as preliminary and may be negotiated during the procurement process. For example, changes in the delivery length, testing requirements, possible delivery alternatives and the need and the number of joints may be modified during the negotiations.
Näytä lisää
Kesto: 24 kuukautta
Vaihtoehtojen kuvaus:
The scope of supply is expected to contain 4 (four) suitable repair joints as an option.
Yhteinen hankintanimikkeistö (CPV)
Täydentävä CPV-koodi: DA23
Suorituspaikka
Pääkohde tai suorituspaikka:
Manufacturing and testing of the cable will be done at the facilities of the Tenderer. All products are to be delivered to southern Sweden.

Oikeudelliset, taloudelliset, rahoitukselliset ja tekniset tiedot
Osallistumisehdot
Kelpoisuus harjoittaa ammattitoimintaa: These are defined in the prequalification document and in the ESPD document.

Menettely
Sovellettava hankintalainsäädäntö:
Finnish law (“Laki vesi- ja energiahuollon, liikenteen ja postipalvelujen alalla toimivien yksiköiden hankinnoista”).
Tarjousten vastaanottoaika: 13:00
Kielet, joilla tarjoukset tai osallistumishakemukset voidaan jättää: englanti 🗣️

Hankintaviranomainen
Tunnistetiedot
Kansallinen rekisterinumero: 1072894-3
Hankintaviranomaisen nimi: Svenska kraftnät
Postitoimipaikka: Sundbyberg
Maa: Ruotsi 🇸🇪
Extra-Regio NUTS 3 🏙️
Yhteystiedot
Yhteyspiste: Jussi Rantanen
Internetosoite: www.fingrid.fi 🌏
: www.svk.se 🌏
Asiakirjojen URL-osoite: www.fingrid.fi 🌏
Maa: Helsinki-Uusimaa 🏙️

Täydentävät tiedot
Arvostelurunko
Nimi: Markkinaoikeus
Postiosoite: Radanrakentajantie 5
Postitoimipaikka: Helsinki
Postinumero: 00520
Maa: Suomi 🇫🇮
Puhelin: +358 295643300 📞
Sähköposti: markkinaoikeus@oikeus.fi 📧
Faksi: +358 295643314 📠
Internetosoite: http://www.oikeus.fi/markkinaoikeus 🌏
Lähde: OJS 2018/S 060-133415 (2018-03-26)
Ilmoitus tehdystä sopimuksesta (2019-04-12)
Kohde
Hankinnan laajuus
Lyhyt kuvaus:
The agreement contains design, manufacturing, testing and delivery of a 2 000 meter long Mass Impregnated Non Draining (MIND) cable suitable to be used as the Fenno-Skan 1 HVDC spare cable. The scope of supply contains 4 (four) suitable repair joints as an option.
Näytä lisää
Ilmoituksen metatiedot
Asiakirjatyyppi: Ilmoitus tehdystä sopimuksesta
Suorituspaikka
NUTS-alue: Extra-Regio NUTS 3 🏙️

Menettely
Tarjouksen tyyppi: Ei sovelleta
Myöntämisperusteet
Alin hinta

Hankintaviranomainen
Yhteystiedot
Faksi: +358 303955199 📠

Viite
Päivämäärät
Lähetyspäivä: 2019-04-12 📅
Julkaisupäivä: 2019-04-16 📅
Tunnisteet
Ilmoituksen numero: 2019/S 075-179432
Viittaa ilmoitukseen: 2018/S 060-133415
EUVL-S-numero: 75

Kohde
Hankinnan laajuus
Lyhyt kuvaus:
The agreement contains design, manufacturing, testing and delivery of a 2 000 meter long Mass Impregnated Non Draining (MIND) cable suitable to be used as the Fenno-Skan 1 HVDC spare cable.
The scope of supply contains 4 (four) suitable repair joints as an option.
Vaihtoehtojen kuvaus: The scope of supply contains 4 (four) suitable repair joints as an option.

Menettely
Sovellettava hankintalainsäädäntö:
Finnish Law (“Laki vesi- ja energiahuollon, liikenteen ja postipalvelujen alalla toimivien yksiköiden hankinnoista”)

Sopimuksen tekeminen
Sopimuksen tekemispäivä: 2019-03-29 📅
Lähde: OJS 2019/S 075-179432 (2019-04-12)