The battery concept for distribution network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a Frequency Containment Reserve for Normal Operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS Supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS Supplier shall work together as the Innovation Partners (the Innovation Partners) to develop the Battery Concept for Distribution Network.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2020-07-01.
Hankinta julkaistiin 2020-06-12.
hankintailmoitus (2020-06-12) Kohde Hankinnan laajuus
Otsikko: Sähkökoneet, -kojeet, -laitteet ja -kulutustarvikkeet; valaistus
Lyhyt kuvaus:
The battery concept for distribution network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a Frequency Containment Reserve for Normal Operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS Supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS Supplier shall work together as the Innovation Partners (the Innovation Partners) to develop the Battery Concept for Distribution Network.
The battery concept for distribution network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a Frequency Containment Reserve for Normal Operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS Supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS Supplier shall work together as the Innovation Partners (the Innovation Partners) to develop the Battery Concept for Distribution Network.
Kohde Hankinnan laajuus
Arvioitu kokonaisarvo: 7 000 000 EUR 💰
Lyhyt kuvaus:
The Battery Concept for Distribution Network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a Frequency Containment Reserve for Normal Operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS supplier shall work together as the innovation partners (the Innovation Partners) to develop the battery concept for distribution network.
The Battery Concept for Distribution Network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a Frequency Containment Reserve for Normal Operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS supplier shall work together as the innovation partners (the Innovation Partners) to develop the battery concept for distribution network.
Menettely
Oikeusperusta: 32014L0025
Tarjousten vastaanottoaika: 13:00
Kielet, joilla tarjoukset tai osallistumishakemukset voidaan jättää: englanti 🗣️
suomi 🗣️
Tarjouksen voimassaoloaika: 2020-12-31 📅
Täydentävät tiedot Arvostelurunko
Nimi: Markkinaoikeus
Postiosoite: Radanrakentajantie 5
Postitoimipaikka: Helsinki
Postinumero: 00520
Maa: Suomi 🇫🇮
Puhelin: +358 295643300📞
Sähköposti: markkinaoikeus@oikeus.fi📧
Internetosoite: http://www.oikeus.fi/markkinaoikeus🌏
Lähde: OJS 2020/S 115-280252 (2020-06-12)
Ilmoitus tehdystä sopimuksesta (2020-07-01) Kohde Hankinnan laajuus
Lyhyt kuvaus:
The Battery Concept for Distribution Network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a frequency containment reserve for normal operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS Supplier shall work together as the innovation partners (the Innovation Partners) to develop the battery concept for distribution network.
The Battery Concept for Distribution Network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a frequency containment reserve for normal operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS Supplier shall work together as the innovation partners (the Innovation Partners) to develop the battery concept for distribution network.
This contract notice has to be cancelled because of integration errors between Hilma (official service for notices on public procurement in Finland) and TED (online version of the 'Supplement to the Official Journal' of the EU).
New contract notice will be published immediately.
This contract notice has to be cancelled because of integration errors between Hilma (official service for notices on public procurement in Finland) and TED (online version of the 'Supplement to the Official Journal' of the EU).
New contract notice will be published immediately.
Kohde Hankinnan laajuus
Lyhyt kuvaus:
The battery concept for distribution network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a frequency containment reserve for normal operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS Supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS Supplier shall work together as the innovation partners (the Innovation Partners) to develop the battery concept for distribution network.
The battery concept for distribution network concerns products and services required in the Battery Energy Storage System (BESS) located in the medium voltage network to be used by the Battery Service Provider (BSP) as a frequency containment reserve for normal operation (FCR-N) or other suitable markets. Distribution system operator (DSO) can purchase reservation time from the battery capacity approximately of 1-5 % of the total operational time and use the BESS automatically during an unexpected interruption of supplying network. BESS shall be able to support island operations fully automatically. The BSP shall also supply, own and develop a battery system connected to DSO’ Battery Connection System (BCS). The BCS Supplier shall be responsible for delivering the BCS for DSO which is then operated by DSO and BSP. Both the BSP and the BCS Supplier shall work together as the innovation partners (the Innovation Partners) to develop the battery concept for distribution network.
Viite Lisätietoja
This contract notice has to be cancelled because of integration errors between Hilma (official service for notices on public procurement in Finland) and TED (online version of the 'Supplement to the Official Journal' of the EU).
New contract notice will be published immediately.