Keravan Lämpövoima Oy is planning to build a new flue gas condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80MW. The heat from flue gas condensation will be utilized in heating the district heating water. The flue gas condensate is purified and utilized as plant make-up water (potable water quality). The procurement covers design, materials and structures, equipment, erection, testing and commissioning of the flue gas condensation and condensate purification plant as defined in the procurement documents ("Turn-key-delivery"). Additionally the contracting authority reserves the right to procure options as defined in the contract notice. The procurement is conditional, there is no investment decision made for execution of the procurement yet.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2018-10-05.
Hankinta julkaistiin 2018-09-05.
hankintailmoitus (2018-09-05) Kohde Hankinnan laajuus
Otsikko: Vastapainevoimalaitosten rakennustyöt
Lyhyt kuvaus:
Keravan Lämpövoima Oy is planning to build a new flue gas condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80MW.
The heat from flue gas condensation will be utilized in heating the district heating water. The flue gas condensate is purified and utilized as plant make-up water (potable water quality).
The procurement covers design, materials and structures, equipment, erection, testing and commissioning of the flue gas condensation and condensate purification plant as defined in the procurement documents ("Turn-key-delivery").
Additionally the contracting authority reserves the right to procure options as defined in the contract notice.
The procurement is conditional, there is no investment decision made for execution of the procurement yet.
Keravan Lämpövoima Oy is planning to build a new flue gas condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80MW.
The heat from flue gas condensation will be utilized in heating the district heating water. The flue gas condensate is purified and utilized as plant make-up water (potable water quality).
The procurement covers design, materials and structures, equipment, erection, testing and commissioning of the flue gas condensation and condensate purification plant as defined in the procurement documents ("Turn-key-delivery").
Additionally the contracting authority reserves the right to procure options as defined in the contract notice.
The procurement is conditional, there is no investment decision made for execution of the procurement yet.
Ilmoituksen metatiedot
Alkukieli: englanti 🗣️
Asiakirjatyyppi: hankintailmoitus
Sopimuksen luonne: Urakat
Asetus: Euroopan unioni ja WTO-maat
Yhteinen hankintanimikkeistö (CPV)
Koodi: Vastapainevoimalaitosten rakennustyöt📦
Lisä-CPV-koodi: Kattilalaitteistot📦 Suorituspaikka
NUTS-alue: Helsinki-Uusimaa🏙️
Menettely
Menettelyn tyyppi: Neuvottelumenettely
Tarjouksen tyyppi: Tarjous koskee kaikkia eriä
Myöntämisperusteet
Kokonaistaloudellisesti edullisin tarjous
The candidate who intends to participate to the procurement, and eventually submit a request to participate application, is required to inform his contact email to the email address panu.vilmi@sweco.fi. In case of any amendments to the contract notice documents required, the amendments will be submitted to the candidates who have informed their email.
The candidate is responsible for all his costs which originate in preparing the application or the tender and taking part to the procurement, despite the procurement results.
The application for participation (request to participate) shall be done by filling the application form in appendix 1.
The candidate shall give all information as specified and required in the appendix 1.
The application for participation (request to participate) including all appendices shall be submitted by the time limit to the email address panu.vilmi@sweco.fi.
The procurement estimated value which may have been specified in the chapter II 2.6) is an estimate and in no way binding to the contracting authority.
ESPD form (appendix 2.1) includes only the mandatory exclusion grounds. Conditions for the economical/technical suitability which the candidate is required to fulfill are specified in the appendix 3. The candidate shall submit all the reports required to verify the fulfillment of the economical/technical suitability requirements (appendix 3).
The contracting authority has reserved the right to limit the number of suitable candidates. (appendix 4)
Appendices to the contract notice;
App. 1. Request to participate (form)
App. 2. Exclusion grounds
App. 2.1 ESPD xml-form
App. 2.2 ESPD pdf-form (economic-operator-view)
App. 3. Suitability criteria (criteria for suitable candidates)
App. 4. Reduction criteria (for limiting the number of suitable candidates)
App. 5. Preliminary specification:
— delivery description,
— procurement process description,
— award criteria,
— preliminary technical information.
App. 5.1 Delivery limits/Flow sheet
App. 5.2 Site layout.
The candidate who intends to participate to the procurement, and eventually submit a request to participate application, is required to inform his contact email to the email address panu.vilmi@sweco.fi. In case of any amendments to the contract notice documents required, the amendments will be submitted to the candidates who have informed their email.
The candidate is responsible for all his costs which originate in preparing the application or the tender and taking part to the procurement, despite the procurement results.
The application for participation (request to participate) shall be done by filling the application form in appendix 1.
The candidate shall give all information as specified and required in the appendix 1.
The application for participation (request to participate) including all appendices shall be submitted by the time limit to the email address panu.vilmi@sweco.fi.
The procurement estimated value which may have been specified in the chapter II 2.6) is an estimate and in no way binding to the contracting authority.
ESPD form (appendix 2.1) includes only the mandatory exclusion grounds. Conditions for the economical/technical suitability which the candidate is required to fulfill are specified in the appendix 3. The candidate shall submit all the reports required to verify the fulfillment of the economical/technical suitability requirements (appendix 3).
The contracting authority has reserved the right to limit the number of suitable candidates. (appendix 4)
Appendices to the contract notice;
App. 1. Request to participate (form)
App. 2. Exclusion grounds
App. 2.1 ESPD xml-form
App. 2.2 ESPD pdf-form (economic-operator-view)
App. 3. Suitability criteria (criteria for suitable candidates)
App. 4. Reduction criteria (for limiting the number of suitable candidates)
App. 5. Preliminary specification:
— delivery description,
— procurement process description,
— award criteria,
— preliminary technical information.
App. 5.1 Delivery limits/Flow sheet
App. 5.2 Site layout.
Kohde Hankinnan laajuus
Lyhyt kuvaus:
Keravan Lämpövoima Oy is planning to build a new flue gas condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80MW.
Keravan Lämpövoima Oy is planning to build a new flue gas condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80MW.
The heat from flue gas condensation will be utilized in heating the district heating water. The flue gas condensate is purified and utilized as plant make-up water (potable water quality).
The procurement covers design, materials and structures, equipment, erection, testing and commissioning of the flue gas condensation and condensate purification plant as defined in the procurement documents ("Turn-key-delivery").
Additionally the contracting authority reserves the right to procure options as defined in the contract notice.
The procurement is conditional, there is no investment decision made for execution of the procurement yet.
Arvioitu kokonaisarvo: 5 000 000 EUR 💰
Lyhyt kuvaus:
Keravan Lämpövoima Oy is planning to build a new flue gas condensing and condensate purification plant (FGC plant) for district heat production to existing CHP plant in Kerava, Finland.
The power plant uses wood chips and milled peat as main fuel.
The delivery consist of design, materials and equipment, erection and building works, supervision, testing, commissioning and training. The scope of delivery is e.g.:
— flue gas scrubbing/condensing equipment,
— duct works and modifications from existing flue gas duct to flue gas condenser and to the stack including needed dampers etc.,
— modification of existing recirculation gas duct,
— condensate cooling and purification equipment,
— condensate reject feeding line to the boiler and/or line to sewer and/or reject drying/filtering equipment and/or space reservation for them,
— building works (foundations by the contracting entity) for flue gas condensing and condensate purification and other equipment included in the delivery,
— automation and instrumentation of the plant,
— electrification of the plant,
— spare parts,
— documentation required during the project execution as design documents and progress reports,
— documentation and training required for the FGC plant operation and service,
— modifications to the existing duct works etc. required to connect the delivery to the existing plant,
— Option 1; new inner liner to the existing stack (new stack if modification of the existing would not be realistic),
— Option 2; continuous emission monitoring system
— Option 3; dehydration/filtering press for reject water
The candidate should note that the technical concept will be discussed in the negotiations and thus the delivery may change based on the outcome of the negotiations.
Kesto: 13 kuukautta
Vaihtoehtojen kuvaus:
Procurement options:
Option 1: Modification of the existing stack (change/revision works of the liner) to make it suitable for the flue gas condensing operation and by-pass operations.
Option 2: Flue gas continuous emission measurements.
Option 3: Dehydration/filtering press for reject water.
Suorituspaikka
Pääkohde tai suorituspaikka:
CHP plant / Site address;
Keravan Lämpövoima Oy
KELVO CHP plant
Myllykorventie 20
Kerava
Oikeudelliset, taloudelliset, rahoitukselliset ja tekniset tiedot Osallistumisehdot
Kelpoisuus harjoittaa ammattitoimintaa:
Suitability conditions for participation are specified in the appendices of the contact notice.
The candidate who intends to participate to the procurement, and eventually submit a request to participate application, is required to inform his contact email to the email address panu.vilmi@sweco.fi. In case of any amendments to the contract notice documents required, the amendments will be submitted to the candidates who have informed their email.
The candidate who intends to participate to the procurement, and eventually submit a request to participate application, is required to inform his contact email to the email address panu.vilmi@sweco.fi. In case of any amendments to the contract notice documents required, the amendments will be submitted to the candidates who have informed their email.
The candidate is responsible for all his costs which originate in preparing the application or the tender and taking part to the procurement, despite the procurement results.
The application for participation (request to participate) shall be done by filling the application form in appendix 1.
The candidate shall give all information as specified and required in the appendix 1.
The application for participation (request to participate) including all appendices shall be submitted by the time limit to the email address panu.vilmi@sweco.fi.
The procurement estimated value which may have been specified in the chapter II 2.6) is an estimate and in no way binding to the contracting authority.
ESPD form (appendix 2.1) includes only the mandatory exclusion grounds. Conditions for the economical/technical suitability which the candidate is required to fulfill are specified in the appendix 3. The candidate shall submit all the reports required to verify the fulfillment of the economical/technical suitability requirements (appendix 3).
ESPD form (appendix 2.1) includes only the mandatory exclusion grounds. Conditions for the economical/technical suitability which the candidate is required to fulfill are specified in the appendix 3. The candidate shall submit all the reports required to verify the fulfillment of the economical/technical suitability requirements (appendix 3).
The contracting authority has reserved the right to limit the number of suitable candidates. (appendix 4)
Appendices to the contract notice;
App. 1. Request to participate (form)
App. 2. Exclusion grounds
App. 2.1 ESPD xml-form
App. 2.2 ESPD pdf-form (economic-operator-view)
App. 3. Suitability criteria (criteria for suitable candidates)
App. 4. Reduction criteria (for limiting the number of suitable candidates)
Lisätietoilmoitus (2018-10-03) Kohde Hankinnan laajuus
Lyhyt kuvaus:
Keravan Lämpövoima Oy is planning to build a new Flue Gas Condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80 MW.
The heat from flue gas condensation will be utilized in heating the district heating water. The flue gas condensate is purified and utilized as plant make-up water (potable water quality).
The procurement covers design, materials and structures, equipment, erection, testing and commissioning of the flue gas condensation and condensate purification plant as defined in the procurement documents ("Turn-key-delivery").
Additionally the Contracting Authority reserves the right to procure options as defined in the contract notice.
The procurement is conditional, there is no investment decision made for execution of the procurement yet.
Keravan Lämpövoima Oy is planning to build a new Flue Gas Condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80 MW.
The heat from flue gas condensation will be utilized in heating the district heating water. The flue gas condensate is purified and utilized as plant make-up water (potable water quality).
The procurement covers design, materials and structures, equipment, erection, testing and commissioning of the flue gas condensation and condensate purification plant as defined in the procurement documents ("Turn-key-delivery").
Additionally the Contracting Authority reserves the right to procure options as defined in the contract notice.
The procurement is conditional, there is no investment decision made for execution of the procurement yet.
Minor correction to appendix 3 and Item 5 (old wording);
(d) the FCG plant and the candidate’s delivery includes condensate purification equipment which are operated to purify flue gas condensate to the potable water quality
Minor correction to appendix 3 and Item 5 (new wording);
(d) the FCG plant and the candidate’s delivery includes condensate purification/handling equipment
The corrected appendix 3 can be downloaded from the following URL address (includes all appendices, also the ones not changed);
https://filetransfer.swecogroup.com/message/f9kghfZ66gtuib2tr5e3r8
Minor correction to appendix 3 and Item 5 (old wording);
(d) the FCG plant and the candidate’s delivery includes condensate purification equipment which are operated to purify flue gas condensate to the potable water quality
Minor correction to appendix 3 and Item 5 (new wording);
(d) the FCG plant and the candidate’s delivery includes condensate purification/handling equipment
The corrected appendix 3 can be downloaded from the following URL address (includes all appendices, also the ones not changed);
Keravan Lämpövoima Oy is planning to build a new Flue Gas Condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80 MW.
Keravan Lämpövoima Oy is planning to build a new Flue Gas Condensing and condensate purification plant (FGC plant). The FGC plant is intended to be built to the existing CHP plant (Myllykorventie 20, Kerava, Finland) which is firing mainly woody biomass and milled peat. The fuel input of the power plant is about 80 MW.
Additionally the Contracting Authority reserves the right to procure options as defined in the contract notice.