Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal. The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric power output some 160 MWe. District heat will be delivered to Turku Energia Oy and industrial (or process) steam to Fortum Power & Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial steam networks. This supply preliminary consists of 110 kV line for a new Finngrid NSL switchyard including installation and poles to the power plant project NA4 in Naantali.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2015-05-04.
Hankinta julkaistiin 2015-04-17.
Toimittajat
Seuraavat toimittajat mainitaan hankintapäätöksissä tai muissa hankinta-asiakirjoissa:
hankintailmoitus (2015-04-17) Kohde Hankinnan laajuus
Otsikko: Sähkölinjat
Määrä tai laajuus:
The supply shall preliminary consist of (but not limited to):— new 110 kV overhead line from new NA4 CHP plant to Naantalinsalmi Substation (about 900 meters) with all necessary civil etc. works, components, equipment, devices, material, equipment, steel structures, insulators, ropes, fences, gates etc. needed for reliable and safe operation and function of systems,— all necessary and required design, documentation etc. needed for connections and interfaces to other electrical systems for reliable operation of electrical systems,— all necessary site studies, soil investigations, surveys, reports etc. of overhead line area and existing electrical systems, equipment, interfaces etc.,— all necessary documentation, studies, designs, calculations etc. required for works.Detailed description of the work will be handed in to the selected bidders fulfilling the minimum criteria mentioned in this contract notice.
The supply shall preliminary consist of (but not limited to):— new 110 kV overhead line from new NA4 CHP plant to Naantalinsalmi Substation (about 900 meters) with all necessary civil etc. works, components, equipment, devices, material, equipment, steel structures, insulators, ropes, fences, gates etc. needed for reliable and safe operation and function of systems,— all necessary and required design, documentation etc. needed for connections and interfaces to other electrical systems for reliable operation of electrical systems,— all necessary site studies, soil investigations, surveys, reports etc. of overhead line area and existing electrical systems, equipment, interfaces etc.,— all necessary documentation, studies, designs, calculations etc. required for works.Detailed description of the work will be handed in to the selected bidders fulfilling the minimum criteria mentioned in this contract notice.
Ilmoituksen metatiedot
Alkukieli: englanti 🗣️
Asiakirjatyyppi: hankintailmoitus
Sopimuksen luonne: Tavarat
Asetus: Euroopan unioni
Yhteinen hankintanimikkeistö (CPV)
Koodi: Sähkölinjat📦
Menettely
Menettelyn tyyppi: Neuvottelumenettely
Tarjouksen tyyppi: Tarjous koskee kaikkia eriä
Myöntämisperusteet
Kokonaistaloudellisesti edullisin tarjous
Hankintaviranomainen Tunnistetiedot
Maa: Suomi 🇫🇮
Hankintaviranomaisen tyyppi: Yleishyödyllisten palvelujen alalla toimiva yksikkö
Hankintaviranomaisen nimi: Turun Seudun Energiantuotanto Oy
Postiosoite: Satamatie 16
Postinumero: 21100
Postitoimipaikka: Naantali
Yhteystiedot
Sähköposti: heikki.jaakkola@fortum.com📧
Puhelin: +358 504533974📞
The contracting entity reserves the right to invite to the procurement procedure a minimum of three (3) bidders fulfilling the set minimum criteria in this contract notice.
If there is more than three (3) bidders fulfilling the set minimum criteria, the contracting entity reserves the right to select maximum of six (6) bidders that have the largest number of similar references during the last three (3) years.
The contracting entity reserves the right to invite to the procurement procedure a minimum of three (3) bidders fulfilling the set minimum criteria in this contract notice.
If there is more than three (3) bidders fulfilling the set minimum criteria, the contracting entity reserves the right to select maximum of six (6) bidders that have the largest number of similar references during the last three (3) years.
Kohde Hankinnan laajuus
Lyhyt kuvaus:
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric power output some 160 MWe. District heat will be delivered to Turku Energia Oy and industrial (or process) steam to Fortum Power & Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial steam networks.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric power output some 160 MWe. District heat will be delivered to Turku Energia Oy and industrial (or process) steam to Fortum Power & Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial steam networks.
This supply preliminary consists of 110 kV line for a new Finngrid NSL switchyard including installation and poles to the power plant project NA4 in Naantali.
Määrä tai laajuus:
The supply shall preliminary consist of (but not limited to):
— new 110 kV overhead line from new NA4 CHP plant to Naantalinsalmi Substation (about 900 meters) with all necessary civil etc. works, components, equipment, devices, material, equipment, steel structures, insulators, ropes, fences, gates etc. needed for reliable and safe operation and function of systems,
— new 110 kV overhead line from new NA4 CHP plant to Naantalinsalmi Substation (about 900 meters) with all necessary civil etc. works, components, equipment, devices, material, equipment, steel structures, insulators, ropes, fences, gates etc. needed for reliable and safe operation and function of systems,
— all necessary and required design, documentation etc. needed for connections and interfaces to other electrical systems for reliable operation of electrical systems,
— all necessary site studies, soil investigations, surveys, reports etc. of overhead line area and existing electrical systems, equipment, interfaces etc.,
— all necessary documentation, studies, designs, calculations etc. required for works.
Detailed description of the work will be handed in to the selected bidders fulfilling the minimum criteria mentioned in this contract notice.
Suorituspaikka
Pääkohde tai suorituspaikka: Naantali.
Oikeudelliset, taloudelliset, rahoitukselliset ja tekniset tiedot Osallistumisehdot
Kelpoisuus harjoittaa ammattitoimintaa:
TSE is entitled to exclude a Candidate that does not meet the criteria set forth below, or gives false information to TSE Oy.
(1) The Candidate or a person having representation, decision-making or supervisory rights with respect to the Candidate, as well as the subcontractors used by the Candidate, have not been declared guilty in offences of corruptive nature, in fraudulent actions in financial matters, in money laundering or participation in criminal organization by a valid court judgement that appears from the criminal record.
(1) The Candidate or a person having representation, decision-making or supervisory rights with respect to the Candidate, as well as the subcontractors used by the Candidate, have not been declared guilty in offences of corruptive nature, in fraudulent actions in financial matters, in money laundering or participation in criminal organization by a valid court judgement that appears from the criminal record.
(2) The Candidate has not been declared insolvent, its business activities have not been suspended or discontinued or legal proceedings have not been started on the Candidate's bankruptcy or it has not been found out that up to the expected completion date of the contract the Candidates going to be liquidated.
(2) The Candidate has not been declared insolvent, its business activities have not been suspended or discontinued or legal proceedings have not been started on the Candidate's bankruptcy or it has not been found out that up to the expected completion date of the contract the Candidates going to be liquidated.
(3) The Candidate does not have tax or state compulsory social insurance payment debts in Finland or in another country where it is registered or in the country of its residence.
(4) The Candidate is registered to the Trade Register, Commercial register or equal register of its country of incorporation:
— request to participate, Appendix No 1 "General information" must be filled and submitted,
— copy of the registration certificate issued by the relevant institution in Finland or the country of the Candidate's incorporation must be submitted.
Contractor's Obligations and Liability will be checked and it must be fulfilled before contract can be signed (According to the Act 1233/2006).
If the Candidate is a consortium, each member of the consortium shall fulfill these general criteria. Also possible subcontractors shall fulfill such criteria.
Taloudellinen ja rahoituksellinen asema:
Criteria(s) to be fulfilled:
— Company's turn over need to be at least 1 000 000 EUR during the last 3 years.
Document(s) to be submitted:
— Statement signed by the Candidate concerning the average financial turnover of the Candidate excluding VAT) for the period of last three (3) financial years (2012, 2013 and 2014 / 3 latest financial years of the Candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation.
— Statement signed by the Candidate concerning the average financial turnover of the Candidate excluding VAT) for the period of last three (3) financial years (2012, 2013 and 2014 / 3 latest financial years of the Candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation.
— Financial statements of the Candidate for the period of last three (3) financial years (2012, 2013 and 2014 /three latest financial years of the Candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation.
— Financial statements of the Candidate for the period of last three (3) financial years (2012, 2013 and 2014 /three latest financial years of the Candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation.
The Contracting Entity reserves the right to make a credit risk control checking from a solid corporation e.g Suomen Asiakastieto, Bisnode or similar and if the risk value is bigger than 2, the candidate can be excluded.
Tekninen ja ammatillinen pätevyys:
Criteria to be fulfilled:
The Candidate has experience in at least (2) two similar supply value at least 500 000 EUR during the last (3) three years.
Document(s) to be submitted:
— List of the similar projects completed during the last (3) three years where the Bidder has installed similar products according to the form in Appendix 2.
— The Candidate has established a quality management system which is compliant with European or international quality management systems' standards or the Candidate has established similar quality management system.
— A copy of ISO 9001 or equivalent certificate confirming existence of certified quality management system, a copy of a certificate of equivalent quality management system or other evidence (description by the Candidate) of equivalent quality assurance measures to be provided by the Candidate.
— A copy of ISO 9001 or equivalent certificate confirming existence of certified quality management system, a copy of a certificate of equivalent quality management system or other evidence (description by the Candidate) of equivalent quality assurance measures to be provided by the Candidate.
The Contractor is responsible to make sure that the labour management shall be able to communicate in Finnish or English in speech and writing. The supervisor shall also be able to communicate with his/her own personnel or engaged subcontractors without hindrance to ensure that all relevant environmental, health and safety regulations at site and other instructions are fully understood.
The Contractor is responsible to make sure that the labour management shall be able to communicate in Finnish or English in speech and writing. The supervisor shall also be able to communicate with his/her own personnel or engaged subcontractors without hindrance to ensure that all relevant environmental, health and safety regulations at site and other instructions are fully understood.
The candidate should have a service organisation for Finland. In emergency situation on-site service is needed within four hours.
— A presentation of service location and organisations. If the location is not in Finland the candidate must show a reliable plan how they will handle the on-site service 4 hour plan.
Sopimuksen toteuttaminen
Vaadittavat vakuudet ja takuut: Will be specified in RFP.
Tärkeimmät rahoitusehdot ja maksujärjestelyt ja/tai viittaus niitä koskeviin säännöksiin: Will be specified in RFP.
Oikeudellinen muoto, joka sen taloudellisten toimijoiden ryhmittymän, jonka kanssa hankintasopimus tehdään, on otettava: Limited company (Ltd. or Plc.) or equal.
Menettely Kielet
Kieli: englanti 🗣️
suomi 🗣️
Hankintaviranomainen Yhteystiedot
Yhteyspiste: Heikki Jaakkola
Nimi: Pöyry Finland Oy
Postiosoite: Jaakonkatu 3
Postitoimipaikka: Vantaa
Postinumero: 01621
Yhteyspiste: Janne Lavanti
Puhelin: +358 505778985📞
Sähköposti: janne.lavanti@poyry.com📧
: jorma.halmepuro@poyry.com📧