TSE: NA4 CHP-project — Power Plant 110 kV Connection and Power Transmission
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric power output some 160 MWe.
District heat will be delivered to Turku Energia Oy and industrial (or process) steam to Fortum Power and Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial steam networks.
This supply consists of two separate purchasing packages: Slot 1 and Slot 2. The slots will be evaluated as separate tender processes. The contracting entity reserves the right to buy both slots from one company or divide the supply for two separate companies. Both slots must be tendered.
This supply consist of 110 kV Connection and Power Transmissions to the power plant project NA4 in Naantali.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2015-01-05.
Hankinta julkaistiin 2014-12-17.