Marine Geotechnical Investigations

Gasum Oy

The objective of the tender process is to find a contractor for Gasum Oy to perform marine geotechnical investigations for Balticconnector pipeline design and installation. Investigations will cover both near shore and offshore sections in both countries.
Duties of the contractor consist of various field tests. Quantities of tests will be defined more in details in final specification. Offshore water depth is up to 100m. At least 6-8 meter long samples + CPT are required at offshore area. At near shore areas 3 meter's bedrock confirmation by boreholes + definition of soft layers + samples are included. The geotechnical investigations are to be conducted during years 2014 (major work) and 2015 (additional works), starting beginning of May 2014.

Määräaika
Tarjousten vastaanottamisen määräaika oli 2014-02-10. Hankinta julkaistiin 2014-01-20.

Toimittajat
Seuraavat toimittajat mainitaan hankintapäätöksissä tai muissa hankinta-asiakirjoissa:
Kuka?

Mitä?

Missä?

Hankintojen historia
Päivämäärä Asiakirja
2014-01-20 hankintailmoitus
2014-03-10 Ilmoitus tehdystä sopimuksesta
Uudet hankinnat asiaan liittyvissä luokissa 🆕