Distribution management system for electricity distribution network

Fortum

The scope of the procurement is a delivery and implementation of a DMS to be used within Fortum ESD network. DMS system is used to collect information of customers, outages, external cost etc. DMS is also used to locate faults and make the right prioritisation of fault repair. Number of users is estimated to 100. Important prerequisite is that DMS is able to handle all voltage levels of distribution network (low, middle, high voltage). The DMS product should meet requirements of integration with SCADA (Siemens Spectrum), BPM and NIS/GIS (PowerGrid and NetBas) systems.
The delivery should cover:
— Implementation of a suitable DMS product including development, test and production environments,
— Basic training of Fortum DMS administrators,
— Integration to the SCADA, NIS/GIS and BPM systems.
The implementation project is planned to take place during 2013 - 2014 Q2.
Please note that purchasing entity used in the advertisement is only one of the legal entities that will be part of the procurement. This procurement in done for the following legal entities: Fortum Sähkönsiirto OY (FI), Fortum Espoo Distribution OY (FI), Fortum Distribution AB (SE) and Fortum Distribution AS (NO).
In Norway Fortum Distribution AS have established a joint operations centre together with the following legal entities: Fredrikstad EnergiNett AS, Askøy Energi AS and Energi 1 Follo Røyken AS. The DMS will be implemented and used by all these legal entities in the operation centres.
Note also that the buyer reserves the right that also other legal entities in Fortum Corporation shall have the possibility to implement the system and buy system licences.
The scope of project should consist also maintenance of system.