2017-06-02   Balticconnector: Manufacturing and Supply of Offshore Line Pipe (Baltic Connector Oy)
Baltic Connector Oy and Elering As are planning to construct the Balticconnector Pipeline, a bi-directional natural gas pipeline to connect Finland and Estonia. This procurement procedure covers the supply of line pipe completed with internal flow coating, external corrosion coating, concrete weigh coating including supply and installation of aluminum anodes on part of the line pipes. This is a joint procurement of Baltic Connector Oy and Elering AS. Baltic Connector Oy is the Contracting Authority … Näytä hankinnat »
2017-04-28   Balticconnector: Manufacturing and Supply of Offshore Line Pipe (Baltic Connector Oy)
Baltic Connector Oy and Elering As are planning to construct the Balticconnector Pipeline, a bi-directional natural gas pipeline to connect Finland and Estonia. This procurement procedure covers the supply of line pipe completed with internal flow coating, external corrosion coating, concrete weigh coating including supply and installation of aluminum anodes on part of the line pipes. This is a joint procurement of Baltic Connector Oy and Elering AS. Baltic Connector Oy is the Contracting Authority … Näytä hankinnat »
2011-06-10   Paineviemäri Kumpusaari – Lehtoniemi 2011 (Kuopion Vesi Liikelaitos)
Kuopion Vesi Liikelaitos rakennuttaa paineviemäriä välillä Kumpusaari – Lehtoniemi. Putken rakennustyöt ajoittuvat sulavesikaudelle 2011 (elo- marraskuu). Kilpailutuksessa oleva hankinta liittyy tähän hankkeeseen. Rakennushanke käsittää uuden paineviemärin 710-10 PEH SDR 13,6 rakentamisen Kumpusaaresta Lehtoniemeen. Rakennettavan paineviemärin kokonaispituus on noin 1 530 m. Kallaveden vesistöalituksen pituus on noin 1 230 m ja alitussyvyys on syvimmillään noin 20 m. Paineviemäri painotetaan niin, että … Näytä hankinnat »