2023-01-30RENEWAL OF ECONOMIZER TO KIVENLAHTI BIO-HEATING PLANT, ESPOO FINLAND (Fortum Power and Heat Oy)
Turnkey delivery of economizer to Kivenlahti bio-heating plant.
Kivenlahti K4-boiler was commissioned in 2020. The fuel power of the boiler is 49 MW. The fuel is solid wood fuels which consist of recycled wood, forest biomass (forest residues, hard wood chips) and industrial by-products (bark, saw dust). The boiler produces heat to the district heating network of Espoo. The boiler is connected to the district heating network with a heat exchanger. The boiler is a water boiler equipped with a stream drum. …
Näytä hankinnat »
2018-05-09WtE grate boiler and turbine (Lounavoima Oy)
Lounavoima Oy is planning to construct a new Waste to Energy (WtE) CHP Plant to Korvenmäki, Salo. The new CHP plant will be located at the green field site adjacent to the existing municipal landfill site. Korvenmäki WtE plant is going to use source separated municipal solid waste (MSW) as main fuel. The new plant will be designed for 120 000 t /a waste fuel. The combustion and heat recovery technology is based on grate boiler technology. The WtE plant will be purchased preliminary in 6 packages (Lots). …
Näytä hankinnat » Mainitut toimittajat:Steinmüller Babcock Environment GmbH
2015-06-02Renewal of secondary air preheater in Joensuu Power Plant (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to renew a secondary air preheater to 199 MW (fuel) Power Plant in Joensuu, Finland. Power Plant's BFB boiler is biomass and peat fired. The purpose of the air preheater is to recover the heat from the boiler flue gas which increases the thermal efficiency of the boiler by reducing the useful heat lost in the flue gas. The present secondary air preheater manufactured by By-Cast origin from year 2000 is degraded and corroded.
Delivery will be turn-key delivery. …
Näytä hankinnat »
2015-01-28TSE: NA4 CHP-project — Water Treatment and Condensate Polishing Plant (Turun Seudun Energiantuotanto Oy)
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric …
Näytä hankinnat » Mainitut toimittajat:Flootech OyVesi-Pauli Oy
2014-05-15Flue gas cleaning and heat recovery system (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to build a scrubber type flue gas cleaning and heat recovery system to it's 180 MW (fuel) Power Plant in Joensuu, Finland. Power Plant uses biomass and peat as fuel. Purpose of the flue gas cleaning and heat recovery system is primary to produce heat to the district heating network and secondary to reduce sulphur dioxide and dust emissions. Delivery will be turn-key delivery up from the foundation which is in purchaser's scope.
If you are interested to participate to …
Näytä hankinnat »
2014-03-31Wood pellet conversion for two oil-fired boilers (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to convert two oil fired 52MW(fuel) hot water boilers for wood pellet fired boilers in heat boiler plant located in Espoo, Finland. Final investment decision is not yet made, it will be done after receiving the binding offers.
The project is divided to three separate turn-key delivery packages (1. boiler rebuilt and fuel preparation, 2. pellet fuel handling system and 3. flue gas cleaning system) which will be offered separately and independently of each other. …
Näytä hankinnat »
2013-06-17Process modification to change 16 MW start-up gas boiler to district heating (Fortum Power and Heat Oy)
Fortum Power and Heat Oy in Suomenoja Power Plant in Espoo will convert it's gas operated 16MWth boiler, which is mainly used as start-up purposes for bigger boiler, to work as full load boiler to produce heated water for district heating network. For this project we are looking for turn-key supplier which will take the responsibility of modification's process planning, delivery and installation of equipment, pipe works, electrification and instrumentation. Automation (interface to present Metso DNA …
Näytä hankinnat »
2012-04-26Savukaasupesuri (Fortum Power and Heat Oy)
Fortum Power and Heat Oy suunnittelee pesurityyppisen savukaasulauhdutinlaitoksen rakentamista omistamalleen Joensuun 51 MWe / 120 MWth voimalaitokselle. Laitoksen polttoaineena käytetään biomassaa ja turvetta. Toimitus on avaimet käteen toimitus perustuksista ylöspäin.
Investoinnin tarkoituksena on vähentää laitoksen rikkidioksidi- ja hiukkaspäästöjä sekä tuottaa lämpöä kaukolämpöverkkoon.
Ilmoittautuminen tarjoamaan 14.5.2012 klo 12:00 mennessä. Tarjouspyyntöaineisto toimitetaan ilmoittautuneille …
Näytä hankinnat »
2011-12-23Vantaan Energia Oy, Jätevoimalaitos, korkeapaineputkisto (Vantaan Energia Oy)
Vantaan Energia Oy rakentaa jätteenpolttolaitoksen Vantaan Lånmossebergeniin. Laitoksessa tullaan polttamaan syntypaikkalajiteltua sekajätettä n. 340 000 t/a. Tässä hankinnassa on kyse kattilan pääsulkuventtiilin jälkeisestä korkeapaineputkistosta sisältäen materiaalin, esivalmistuksen ja asennuksen.
Näytä hankinnat »
2011-12-055MW KAP-höyrykattilalaitos (Fortum Energiaratkaisut Oy)
Fortum Energiaratkaisu rakentaa uuden kiinteäpolttoainekattilan Säkylän varus-kuntaan. KPA-kattilan teho on 5 MW ja tulee tuottaa kylläistä matalapainehöyryä. Polttoaineena käytetään erilaisia puuperäisiä laatuja ja mahdollisesti palaturvetta. Kattila apulaitteineen sijoitetaan olemassa olevaan lämpölaitosrakennukseen.
Kattila apulaitteineen tulee olla asennettu 15.10.2012 ja kaupallisessa tuotannossa 31.12.2012.
Tarjouskipailun ilmoittautumisaika päättyy 20.12.-11 klo 12:00 ja tarjouspyynnöt tullaan …
Näytä hankinnat »
2011-08-17Järvenpää CHP Project - HP Piping (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to improve the existing district heat production capacity by installing a new combined heat and power plant (the CHP Plant) to cover the base district heat load of the city of Järvenpää, Finland.
The power plant concept consists of 76 MW fuel-power BFB boiler plant and 23 MW electric power steam turbine generator plant. The new plant is planned to be in commercial operation in the middle of year 2013.
This supply consists of high pressure piping including material, …
Näytä hankinnat » Mainitut toimittajat:YIT Teollisuus Oy
2011-07-06Järvenpää CHP Project - Water treatment (Fortum Power and Heat Oy)
Fortum Power and Heat Oy is planning to improve the existing district heat production capacity by installing a new combined heat and power plant (the CHP Plant) to cover the base district heat load of the city of Järvenpää, Finland.
The power plant concept consists of 76 MW fuel-power BFB boiler plant and 23 MW electric power steam turbine generator plant. The new plant is planned to be in commercial operation in the middle of year 2013.
This supply consists of water treatment equipment, demineralization …