2015-05-29   TSE: NA4 CHP-project — Auxiliary Medium Voltage Systems for Power Plant (Turun Seudun Energiantuotanto Oy)
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns 3 coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal. The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric power … Näytä hankinnat »
Mainitut toimittajat: Siemens Osakeyhtiö, Power and Gas Division
2012-06-11   Vantaan Energia Oy, Jätevoimalaitos, 10 kV kojeisto (Vantaan Energia Oy)
Vantaan Energia Oy rakentaa jätteenpolttolaitoksen Vantaan Långmossbergeniin. Laitoksessa tullaan polttamaan syntypaikkalajiteltua sekajätettä n. 340 000 t/a. Tässä hankinnassa on kyse 10 kV kojeistosta. Näytä hankinnat »
Mainitut toimittajat: Siemens Osakeyhtiö