2014-12-17TSE: NA4 CHP-project — Power Plant 110 kV Connection and Power Transmission (Turun Seudun Energiantuotanto Oy)
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric …
Näytä hankinnat »
2013-08-14Ny och ombyggnad av 110 kV stationer (Kraftnät Åland Ab)
Ombyggnad av ÅT00, Tingsbacka 110 kV ställverk.
Nybyggnad av ÅT17, Tellholm 110 kV transformatorstation.
Anslutning av XT1, Ytterby omriktarstation.
Anslutning av XT2, Nådendal omriktarstation.
Åtgärder i 110 kV kopplingspunkt Ingby.
Utbyggnad av ÅT11, Norrböle transformatorstation.
Näytä hankinnat » Mainitut toimittajat:Eltel Networks Oy