Finnish government has decided that Finland will participate in the Dubai Expo 2020 provided that the funding for the project is secured. The government funding (50 %) has been secured and majority of the corporate funding (50 %) has also been secured. The final decision to participate is pending the completion of the corporate funding commitments. Consequently, the final decision to participate has not yet been made, but it is most likely to be made at the end of the summer.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2018-08-09.
Hankinta julkaistiin 2018-07-04.
Kohde Hankinnan laajuus
Otsikko:
“Dubai Expo 2020 Finnish pavilion building design, construction and dismantling
60/27/2018”
Tuotteet/palvelut: Liike-elämän palvelut: laki, markkinointi, neuvonta, työhönotto, painatus ja turvallisuus📦
Lyhyt kuvaus:
“Finnish government has decided that Finland will participate in the Dubai Expo 2020 provided that the funding for the project is secured. The government...”
Lyhyt kuvaus
Finnish government has decided that Finland will participate in the Dubai Expo 2020 provided that the funding for the project is secured. The government funding (50 %) has been secured and majority of the corporate funding (50 %) has also been secured. The final decision to participate is pending the completion of the corporate funding commitments. Consequently, the final decision to participate has not yet been made, but it is most likely to be made at the end of the summer.
Näytä lisää
Arvioitu arvo ilman arvonlisäveroa: EUR 4 000 000 💰
1️⃣
Suorituspaikka: Extra-Regio NUTS 1🏙️
Hankinnan kuvaus:
“Business Finland is government owned entity promoting business development and internationalization of Finnish enterprises, as well as promotion of tourism...”
Hankinnan kuvaus
Business Finland is government owned entity promoting business development and internationalization of Finnish enterprises, as well as promotion of tourism and foreign investment to Finland; consequently, Finnish participation in Dubai Expo directly promotes the aims of Business Finland as well. Finnish government has decided that Finland will participate in the Dubai Expo 2020 provided that the funding for the project is secured. The government funding (50 %) has been secured and majority of the corporate funding (50 %) has also been secured. The final decision to participate is pending the completion of the corporate funding commitments. Consequently, the final decision to participate has not yet been made, but it is most likely to be made at the end of the summer. The aim of this tender is to choose a construction partner that will design, build and dismantle the Finnish Pavilion building at the Dubai Expo 2020 (see Attachment 1 – “Connecting Minds, Creating the Future, A short guide to Expo 2020 Dubai”). The tender is limited to the building and does not cover the works on the allocated plot beyond the building. Finland has tentatively reserved a plot in the “Mobility District” – “Option 1: Self-Build Plot on concource”. The plot is 1 550 m² in size allowing maximum of 1 085 m² buildable zone. The building can be maximum of 15 m in height. The building can be in 2 floors allowing total of 2 170 m² of built floor space. Expo organization has estimated the cost (based on 2016 prices) for maximum size building to be 4 350 000 USD or 3 690 000 EUR (see Attachment 3 – Finland Options 201803). The Expo 2020 rules and regulations allow high amount of design freedom for the building and exhibition design. Finland has decided to aim for cost effective building while the exhibition design within the building and in the exterior will be designed with higher level of ambition. Since the Expo participation budget is limited, the aim is to construct a basic building with very cost effective approach, while more ambition will be exercised in the development and construction of the exhibition placed in this building and in the exterior of the building within the allocated plot. The building needs to be planned and built within the construction codes of UAE, be sufficiently sturdy for a temporary half a year utilization, have sufficient insulation for environmentally sound air-conditioning purposes, to provide a flexible base for construction of the exhibition and to provide a safe and an interesting place for Expo visitors to explore. The process for final design of the pavilion and preparations for construction works should be started immediately after the signing of the contract. Organizer, Expo 2020 Dubai is committed to complete all the building construction (super structures/shell & core) by 20.10.2019. This October 2019 target is set to ensure that all the infrastructure work is completed and that heavy machinery is exiting the site to allow for the commencement and completion of the softer components such as the shading structures, concourses, back of house, landscaping, etc. that will have a major impact on the visitor journey. Organizer, Expo 2020 Dubai, has asked the self-build participants to commit to the same deadline in their construction schedules to ensure that we are jointly delivering a complete and operational site for the guests.
Näytä lisää Myöntämisperusteet
Laatukriteeri (nimi): Quality
Laatukriteeri (painotus): 60
Laatukriteeri (nimi): Price
Laatukriteeri (painotus): 40
Hinta (painotus): Quality 60/Price 40
Hankinnan laajuus
Arvioitu kokonaisarvo ilman arvonlisäveroa: EUR 4 000 000 💰
Kesto
Aloituspäivä: 2018-10-01 📅
Loppupäivä: 2020-07-31 📅
Oikeudelliset, taloudelliset, rahoitukselliset ja tekniset tiedot Osallistumisehdot
Luettelo ja lyhyt kuvaus olosuhteista:
“The tender must adhere to the controls and guides stipulated in the “Self-Build Pavilions Guide” of the Expo 2020 organization. The controls and guides are...”
Luettelo ja lyhyt kuvaus olosuhteista
The tender must adhere to the controls and guides stipulated in the “Self-Build Pavilions Guide” of the Expo 2020 organization. The controls and guides are listed in the chapter 3 “Understanding the Controls and Guides” (see Attachment – self-build pavilions guide). The project leader should have minimum of 5 years of experience in construction sector, as well as demonstrated experience in UAE and be fluent in English. The tendering company should have sufficient experience in building design and construction of minimum of 5 years, as well as experience in operating in the United Arab Emirates area. The tenderer should have experience of at least 2 significant construction projects in UAE.
Näytä lisää Taloudellinen ja rahoituksellinen asema
Luettelo ja lyhyt kuvaus valintaperusteista: See the procurement description for requirement information.
Tekninen ja ammatillinen pätevyys
Luettelo ja lyhyt kuvaus valintaperusteista: See the procurement description for precise requirement information.
Sopimukseen liittyvät ehdot
Sopimuksen täytäntöönpanoehdot:
“The contents and quality of the service are described in detail in the contract draft.” Tiedot sopimuksen toteuttamisesta vastaavasta henkilöstöstä
Velvollisuus ilmoittaa sopimuksen toteuttamiseen nimetyn henkilöstön nimet ja ammatillinen pätevyys
Menettely Toimenpiteen tyyppi
Avoin menettely
Hallinnolliset tiedot
Tarjousten tai osallistumishakemusten vastaanottamisen määräaika: 2018-08-09
16:00 📅
Kielet, joilla tarjoukset tai osallistumishakemukset voidaan jättää: englanti 🗣️
Jäljempänä oleva aikataulu on ilmaistu kuukausina.
Vähimmäisaika, jonka kuluessa tarjoajan on pidettävä tarjous voimassa: 6
Tarjousten avaamista koskevat ehdot: 2018-08-10
09:00 📅
Tarjousten avaamista koskevat ehdot (paikka): Helsinki
Täydentävät tiedot Tietoa sähköisistä työnkuluista
Sähköinen laskutus hyväksytään
Arvostelurunko
Nimi: Markkinaoikeus
Postiosoite: Radanrakentajantie 5
Postitoimipaikka: Helsinki
Postinumero: 00520
Maa: Suomi 🇫🇮
Puhelin: +358 295643300📞
Sähköposti: markkinaoikeus@oikeus.fi📧
Faksi: +358 295643314 📠
URL: http://www.oikeus.fi/markkinaoikeus🌏
Lähde: OJS 2018/S 127-289806 (2018-07-04)