Balticconnector: Manufacturing and Supply of Offshore Line Pipe
Baltic Connector Oy and Elering As are planning to construct the Balticconnector Pipeline, a bi-directional natural gas pipeline to connect Finland and Estonia.
This procurement procedure covers the supply of line pipe completed with internal flow coating, external corrosion coating, concrete weigh coating including supply and installation of aluminum anodes on part of the line pipes.
This is a joint procurement of Baltic Connector Oy and Elering AS. Baltic Connector Oy is the Contracting Authority responsible for carrying out this procurement procedure. Baltic Connector Oy and Elering AS have signed a co-operation agreement on joint procurement of the supplies covered by this procurement procedure. According to the agreement Baltic Connector Oy will be responsible for scheduling, design and overall management of the procurement procedure. However, the supplies shall be provided to both Baltic Connector Oy and Elering AS.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2017-05-29.
Hankinta julkaistiin 2017-04-28.