Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns 3 coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal. The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric power output some 160 MWe. District heat will be delivered to Turku Energia Oy and industrial (or process) steam to Fortum Power and Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial steam networks. This supply consists of Insulation (BoP Area) to the power plant project NA4 in Naantali. Insulation Contract is including the following systems: — High pressure steam system (main steam: design temperature 565 °C, hot reheat and cold reheat systems including for example pipe size DN 700), — Reduction steam system (line DN 1400 including noise insulation), — District heating system, including for example pipe size DN 700, — Bleed steam lines by steam turbine and other low and medium pressure steam systems, — Heavy fuel oil system, — Condensate system, — Spray water system, — Drain systems and low/medium pressure steam headers of the blowdown tank, — Pipe bridge piping (insulation and covering on the bridge), — Tie-in insulations to existing systems, — Other lines and equipment will be specified in RFT later for selected suppliers.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2016-01-28.
Hankinta julkaistiin 2016-01-13.
Toimittajat
Seuraavat toimittajat mainitaan hankintapäätöksissä tai muissa hankinta-asiakirjoissa:
hankintailmoitus (2016-01-13) Kohde Hankinnan laajuus
Otsikko: Voimakoneet
Määrä tai laajuus:
The supply shall preliminary consist of (but not limited to):Scope of work is including:— All needed materials and installation works for insulation/covering, will be specified in RFT later for selected suppliers,— Insulation/covering of pipes and pipe parts (including for example bends, elbows, reducers, T-pieces, condensate pockets) material,— Insulation of process tanks,— Insulation of piping related equipment, for example pumps, valves, flow elements, heat exchangers and silencers,— High/low pressure preheaters,— District heating heat exchangers,— Possible wall/roof penetrations,— Possible anti-condensation insulation,— Scaffolding,— All needed documentation,— More accurate information will be in RFT later for selected suppliers.Note: Insulation standards will be specified in RFT later.Detailed description of the work will be handed in to the selected bidders fulfilling the minimum criteria mentioned in this contract notice.
The supply shall preliminary consist of (but not limited to):Scope of work is including:— All needed materials and installation works for insulation/covering, will be specified in RFT later for selected suppliers,— Insulation/covering of pipes and pipe parts (including for example bends, elbows, reducers, T-pieces, condensate pockets) material,— Insulation of process tanks,— Insulation of piping related equipment, for example pumps, valves, flow elements, heat exchangers and silencers,— High/low pressure preheaters,— District heating heat exchangers,— Possible wall/roof penetrations,— Possible anti-condensation insulation,— Scaffolding,— All needed documentation,— More accurate information will be in RFT later for selected suppliers.Note: Insulation standards will be specified in RFT later.Detailed description of the work will be handed in to the selected bidders fulfilling the minimum criteria mentioned in this contract notice.
Ilmoituksen metatiedot
Alkukieli: englanti 🗣️
Asiakirjatyyppi: hankintailmoitus
Sopimuksen luonne: Tavarat
Asetus: Euroopan unioni
Yhteinen hankintanimikkeistö (CPV)
Koodi: Voimakoneet📦
Menettely
Menettelyn tyyppi: Neuvottelumenettely
Tarjouksen tyyppi: Tarjous koskee kaikkia eriä
Myöntämisperusteet
Kokonaistaloudellisesti edullisin tarjous
Hankintaviranomainen Tunnistetiedot
Maa: Suomi 🇫🇮
Hankintaviranomaisen tyyppi: Yleishyödyllisten palvelujen alalla toimiva yksikkö
Hankintaviranomaisen nimi: Turun Seudun Energiantuotanto Oy
Postiosoite: Satamatie 16
Postinumero: 21100
Postitoimipaikka: Naantali
Yhteystiedot
Sähköposti: heikki.jaakkola@fortum.com📧
Puhelin: +358 504533974📞
The contracting entity reserves the right to invite to the procurement procedure a minimum of 3 bidders fulfilling the set minimum criteria in this contract notice.
If there is more than 3 bidders fulfilling the set minimum criteria, the contracting entity reserves the right to select maximum of 6 bidders that have the largest number of similar references during the last 3 years.
The contracting entity reserves the right to invite to the procurement procedure a minimum of 3 bidders fulfilling the set minimum criteria in this contract notice.
If there is more than 3 bidders fulfilling the set minimum criteria, the contracting entity reserves the right to select maximum of 6 bidders that have the largest number of similar references during the last 3 years.
Kohde Hankinnan laajuus
Lyhyt kuvaus:
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns 3 coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power plant area, where the company already owns 3 coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric power output some 160 MWe. District heat will be delivered to Turku Energia Oy and industrial (or process) steam to Fortum Power and Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial steam networks.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial consumers from steam turbine extractions. The nominal fuel input is some 430 MWfuel and gross electric power output some 160 MWe. District heat will be delivered to Turku Energia Oy and industrial (or process) steam to Fortum Power and Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial steam networks.
This supply consists of Insulation (BoP Area) to the power plant project NA4 in Naantali.
Insulation Contract is including the following systems:
— High pressure steam system (main steam: design temperature 565 °C, hot reheat and cold reheat systems including for example pipe size DN 700),
— Reduction steam system (line DN 1400 including noise insulation),
— District heating system, including for example pipe size DN 700,
— Bleed steam lines by steam turbine and other low and medium pressure steam systems,
— Heavy fuel oil system,
— Condensate system,
— Spray water system,
— Drain systems and low/medium pressure steam headers of the blowdown tank,
— Pipe bridge piping (insulation and covering on the bridge),
— Tie-in insulations to existing systems,
— Other lines and equipment will be specified in RFT later for selected suppliers.
Määrä tai laajuus:
The supply shall preliminary consist of (but not limited to):
Scope of work is including:
— All needed materials and installation works for insulation/covering, will be specified in RFT later for selected suppliers,
— Insulation/covering of pipes and pipe parts (including for example bends, elbows, reducers, T-pieces, condensate pockets) material,
— Insulation of process tanks,
— Insulation of piping related equipment, for example pumps, valves, flow elements, heat exchangers and silencers,
— High/low pressure preheaters,
— District heating heat exchangers,
— Possible wall/roof penetrations,
— Possible anti-condensation insulation,
— Scaffolding,
— All needed documentation,
— More accurate information will be in RFT later for selected suppliers.
Note: Insulation standards will be specified in RFT later.
Detailed description of the work will be handed in to the selected bidders fulfilling the minimum criteria mentioned in this contract notice.
Vaihtoehtojen kuvaus:
Option 1: Take-out price for pipe bridge piping insulation on the ground before the pipe bridge lifting.
Option 2: Insulation of raw and make-up water tanks.
Suorituspaikka
Pääkohde tai suorituspaikka: Naantali.
Oikeudelliset, taloudelliset, rahoitukselliset ja tekniset tiedot Osallistumisehdot
Kelpoisuus harjoittaa ammattitoimintaa:
TSE is entitled to exclude a Candidate that does not meet the criteria set forth below, or gives false information to TSE Oy.
(1) The Candidate or a person having representation, decision-making or supervisory rights with respect to the Candidate, as well as the subcontractors used by the Candidate, have not been declared guilty in offences of corruptive nature, in fraudulent actions in financial matters, in money laundering or participation in criminal organization by a valid court judgement that appears from the criminal record.
(1) The Candidate or a person having representation, decision-making or supervisory rights with respect to the Candidate, as well as the subcontractors used by the Candidate, have not been declared guilty in offences of corruptive nature, in fraudulent actions in financial matters, in money laundering or participation in criminal organization by a valid court judgement that appears from the criminal record.
(2) The Candidate has not been declared insolvent, its business activities have not been suspended or discontinued or legal proceedings have not been started on the Candidate's bankruptcy or it has not been found out that up to the expected completion date of the contract the Candidateis going to be liquidated.
(2) The Candidate has not been declared insolvent, its business activities have not been suspended or discontinued or legal proceedings have not been started on the Candidate's bankruptcy or it has not been found out that up to the expected completion date of the contract the Candidateis going to be liquidated.
(3) The Candidate does not have tax or state compulsory social insurance payment debts in Finland or in another country where it is registered or in the country of its residence.
(4) The Candidate is registered to the Trade Register, Commercial register or equal register of its country of incorporation:
— Request to participate, Appendix No 1 ‘General information’ must be filled and submitted.
— Copy of the registration certificate issued by the relevant institution in Finland or the country of the Candidate's incorporation must be submitted.
Contractor's Obligations and Liability will be checked and it must be fulfilled before contract can be signed (According to the Act 1233/2006).
If the Candidate is a consortium, each member of the consortium shall fulfil these general criteria. Also possible subcontractors shall fulfil such criteria.
Taloudellinen ja rahoituksellinen asema:
Criteria(s) to be fulfilled:
— Company's annual turn over need to be at least 4 000 000 EUR (four million), each year, during the last 3 years.
Document(s) to be submitted:
— Statement signed by the Candidate concerning the average financial turnover of the Candidate excluding VAT) for the period of last three (3) financial years (2012, 2013 and 2014 /3 latest financial years of the Candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation.
— Statement signed by the Candidate concerning the average financial turnover of the Candidate excluding VAT) for the period of last three (3) financial years (2012, 2013 and 2014 /3 latest financial years of the Candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation.
— Financial statements of the Candidate for the period of last three (3) financial years (2012, 2013 and 2014 /3 latest financial years of the Candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation.
— Financial statements of the Candidate for the period of last three (3) financial years (2012, 2013 and 2014 /3 latest financial years of the Candidate). Candidates that have been established later shall submit the aforementioned documents for the period of operation.
The Contracting Entity reserves the right to make a credit risk control checking from a solid corporation e.g. Suomen Asiakastieto, Bisnode or similar. If the risk value is bigger than 2, the candidate can be excluded. The Rating alfa must be at least level A or better. If the alfa rating is lower, the candidate can be excluded.
The Contracting Entity reserves the right to make a credit risk control checking from a solid corporation e.g. Suomen Asiakastieto, Bisnode or similar. If the risk value is bigger than 2, the candidate can be excluded. The Rating alfa must be at least level A or better. If the alfa rating is lower, the candidate can be excluded.
Tekninen ja ammatillinen pätevyys:
Criteria to be fulfilled:
The Candidate has experience in at least (2) two similar product (Insulation, main steam value ≥ 500 °C) supply for power plant total value (sum of the two projects) at least 500 000 EUR during the last (3) three years in EU region.
Document(s) to be submitted:
— List of the similar projects completed during the last (3) three years where the Bidder has installed similar products according to the form in Appendix 2.
— The Candidate has established a quality management system which is compliant with European or international quality management systems' standards or the Candidate has established similar quality management system.
— A copy of ISO 9001 or equivalent certificate confirming existence of certified quality management system, a copy of a certificate of equivalent quality management system or other evidence (description by the Candidate) of equivalent quality assurance measures to be provided by the Candidate.
— A copy of ISO 9001 or equivalent certificate confirming existence of certified quality management system, a copy of a certificate of equivalent quality management system or other evidence (description by the Candidate) of equivalent quality assurance measures to be provided by the Candidate.
The Contractor is responsible to make sure that the labour management shall be able to communicate in Finnish or English in speech and writing. The supervisor shall also be able to communicate with his/her own personnel or engaged subcontractors without hindrance to ensure that all relevant environmental, health and safety regulations at site and other instructions are fully understood.
The Contractor is responsible to make sure that the labour management shall be able to communicate in Finnish or English in speech and writing. The supervisor shall also be able to communicate with his/her own personnel or engaged subcontractors without hindrance to ensure that all relevant environmental, health and safety regulations at site and other instructions are fully understood.
— A presentation of organization.
Sopimuksen toteuttaminen
Vaadittavat vakuudet ja takuut: Will be specified in RFP.
Tärkeimmät rahoitusehdot ja maksujärjestelyt ja/tai viittaus niitä koskeviin säännöksiin: Will be specified in RFP.
Oikeudellinen muoto, joka sen taloudellisten toimijoiden ryhmittymän, jonka kanssa hankintasopimus tehdään, on otettava: Limited company (Ltd. or Plc.) or equal.
Menettely Kielet
Kieli: englanti 🗣️
suomi 🗣️
Hankintaviranomainen Yhteystiedot
Yhteyspiste: Heikki Jaakkola
Nimi: Pöyry Finland Oy
Postiosoite: Jaakonkatu 3
Postitoimipaikka: Vantaa
Postinumero: 01621
Yhteyspiste: Janne Lavanti
Puhelin: +358 505778985📞
Sähköposti: janne.lavanti@poyry.com📧
: jyrki.kovanen@poyry.com📧
Ilmoitus tehdystä sopimuksesta (2016-08-16) Kohde Hankinnan laajuus
Lyhyt kuvaus:
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power
plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3).
Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial
consumers from steam turbine extractions. The nominal fuel input is some 430 MW fuel and gross electric
power output some 160 MWe. District heat will be delivered to Turku Energia Oy and industrial (or process)
steam to Fortum Power and Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial
steam networks.
This contract consist of Insulation to the power plant project NA4 in Naantali.
Turun Seudun Energiantuotanto Oy builds a new combined heat and power unit (NA4) in an existing power
plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3).
Energy production of the new unit is based on wood- and agro-originated biomass, peat and coal.
The CHP unit's nominal production rate will be 200 MWDH district heat and 50 MWth steam for industrial
consumers from steam turbine extractions. The nominal fuel input is some 430 MW fuel and gross electric
power output some 160 MWe. District heat will be delivered to Turku Energia Oy and industrial (or process)
steam to Fortum Power and Heat Oy for retail. NA4 CHP will be connected to existing district heat and industrial
steam networks.
This contract consist of Insulation to the power plant project NA4 in Naantali.
The contract consist of (but not limited to):
— All needed materials and installation works for insulation/covering,
— Insulation/covering of pipes and pipe parts (including for example bends, elbows, reducers, T-pieces, condensate pockets) material,
— Insulation of process tanks,
— Insulation of piping related equipment, for example pumps, valves, flow elements, heat exchangers and silencers,
— High/low pressure preheaters,
— District heating heat exchangers,
— Possible wall/roof penetrations,
— Possible anti-condensation insulation,
— Scaffolding,
— All needed documentation.
Menettely Myöntämisperusteet
Laatukriteeri (nimi): Specified in the Request For Tender documents
Laatukriteeri (painotus): 20
Hinta (painotus): 80
Sopimuksen tekeminen
Sopimuksen tekemispäivä: 2016-06-27 📅
Nimi: Arme Oy
Postitoimipaikka: Vantaa
Maa: Suomi 🇫🇮 Uusimaa
🏙️ Tietoa tarjouskilpailuista
Saatujen tarjousten määrä: 3