Refurbishment of Keminmaa 400 kV series capacitors
Fingrid Oyj has decided to renew the duplicated control and protection systems of 2 series capacitors in Keminmaa substation as a turnkey basis. The substation area is situated in northern Finland, approximately 20 km north of Kemi.
The delivery includes complete replacement of old control and protection systems as a turnkey basis including all design, civil works, electrical equipment, installations, testing, commissioning etc. Also some refurbishment works for ladders, cranes, safety equipment etc. are included in the project. The old systems are delivered by Nokia Capacitors in 1997.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2015-12-04.
Hankinta julkaistiin 2015-11-06.
Toimittajat
Seuraavat toimittajat mainitaan hankintapäätöksissä tai muissa hankinta-asiakirjoissa:
Kuka?
Mitä?
Hankintojen historia
Päivämäärä |
Asiakirja |
2015-11-06
|
hankintailmoitus
|
2016-06-09
|
Ilmoitus tehdystä sopimuksesta
|