Air Heater elements replacement at Naantali Power Plant Boiler 3 (315 MWth)
Air Heater elements replacement for TSE Oy owned and Fortum Power and Heat Oy operated Naantali Power Plant Boiler no. 3. Delivery scope will contain a delivery of new elements includung dismantling and installation work at the Power Plant.
Boiler and Air Heater:
Boiler type: Sulzer 0.006.051,
Boiler capacity: 430t/h , 318MWth
Fuel : Bituminous coal, LHV=26,8MJ/kg, ash ≤15,0%, S ≤1,0%
Boiler will be equipped with SCR process in 2015 which need be taken into account in the selection of element materials.
Amount of AH /boiler: 2 pcs
AH manufacturer: Kraftanlagen AG, KAH: 203118
AH type: CXS 24,5/1900
Heating surface: 29800 m2
Weight: appr. 63 t
Dimensioning values for Air Heater:
Fluegas amount before AH: 109,3 Nm3/s
Air amount before AH: 83,5 Nm3/s
CO2-content in fluegas before AH: 15 vol-%
CO2-content in fluegas after AH: 14 vol-%
Fluegas temperatures before/after AH: 365 degC / 125 degC
Air temperatures before/after AH: 40 degC / 330 degC
Draft loss fluegas side: 570 Pa
Draft loss air side: 1180 Pa
Pressure difference between gas/air side: 6670 Pa
Construction
Rotor diameter: 6980 mm
Rotor height: 2045mm
Heating element height in hot side: 800 mm with 0,5mm thickness, axial replacement
Heating element height in middle side: 800 mm with 0,5mm thickness, axial replacement
Heating element height in cold side: 300 mm with 1,0 mm thickness, in boxes radial replacement
Heating element profile: DU 4,8
AH is provided with infra sound cleaning system
If you are interested to participate to tendering, please leave your application by 31.3.2013 at 12:00 Finnish time to
petteri.malinen@fortum.com.
In the application please inform the following:
1. Participating company's official name and ID number
2. References according to III.2.3)
3. Contact information (contact person and e-mail address) where to deliver the offer request.
4. Balance sheet according to III.2.2)
RfQ will be delivered to accepted applicants during April 2014.
Preliminary project schedule:
— Negotiations May 2014,
— Supplier selected and contract signed June 2014,
— Take-over of the delivery by September 2015.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2014-03-31.
Hankinta julkaistiin 2014-01-14.