Process modification to change 16 MW start-up gas boiler to district heating
Fortum Power and Heat Oy in Suomenoja Power Plant in Espoo will convert it's gas operated 16MWth boiler, which is mainly used as start-up purposes for bigger boiler, to work as full load boiler to produce heated water for district heating network. For this project we are looking for turn-key supplier which will take the responsibility of modification's process planning, delivery and installation of equipment, pipe works, electrification and instrumentation. Automation (interface to present Metso DNA DCS-system) can be offered as an option.
Main equipment of the project will be:
— heat exchanger (about 16MW);
— economizer (about 2MW);
— centrifugal water pumps (140kW);
— piping, valves, instrumentation, sampling.
More information of the project can be found from:
http://www.fortum.com/en/corporation/purchasing/pages/contract-notices.aspx
Application to tendering need to be delivered by 4.7.2013 at 12:00 Finnish time to
petteri.malinen@fortum.com
Offer request will be delivered to accepted applicants at 5th of July and dead line of the offers will be 23rd of August. Suppliers which have given competitive offer will be asked for further negotiations.
Määräaika
Tarjousten vastaanottamisen määräaika oli 2013-07-04.
Hankinta julkaistiin 2013-06-17.